Orange County NC Website
17 <br /> Proposed Utility District <br /> Total Water Cost <br /> Construction Cost $ 3,835,724 <br /> Engineering, Design and Permitting 10% $ 383,572 <br /> Construction Administration 5% $ 191,786 <br /> Construction Inspection 5% $ 191,786 <br /> 20%Contingency $ 920,575 <br /> Sub Total $ 5,523,443 <br /> Service Availability Fees $ 441,408 <br /> Meter Cost $ 26,400 <br /> Total $ 5,991,251 <br /> Number of parcels served 132 <br /> Cost Per Parcel $ 45,388 <br /> Exhibit 4 <br /> Water Map <br /> Mw <br /> F F7 <br /> 4 <br /> J <br /> kwie ma <br /> II (Om4ttweyl GroeeTaact <br /> 5 <br /> "T49. Weer!Tgtll <br /> ;101St OunxsHi) <br /> i <br /> } 4 <br /> eaene tt <br /> 11 <br />