Browse
Search
Agenda - 03-06-2014 - 6f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 03-06-2014 - Regular Mtg.
>
Agenda - 03-06-2014 - 6f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2014 10:48:54 AM
Creation date
2/28/2014 4:01:53 PM
Metadata
Fields
Template:
BOCC
Date
3/6/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6f
Document Relationships
Minutes 03-06-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
ORD-2014-001 Ordinance Amending the Unified Development Ordinance of Orange County incorporating State Law related changes to the Board of Adjustment
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2014
ORD-2014-010 Correction to Ordinance 2014-001 Board of Adjustment Operations and Procedures
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures 9 <br /> Section 2.10:Variances <br /> I only be issued(3) Variances shat y upon: <br /> (a) A showing of good and sufficient cause; <br /> (b) A determination that failure to grant the variance would result in <br /> exceptional hardship; <br /> (c) A determination that the granting of a variance will not result in increased <br /> flood heights, additional threats to public safety, or extraordinary public <br /> expense, create nuisance,cause fraud on or victimization of the public, <br /> or conflict with existing local laws or ordinances; and, <br /> (d) That the circumstances on the subject property are unique to the subject <br /> property and not to properties in general. <br /> (G) Any applicant to whom a variance is granted shall be given written notice specifying the <br /> difference between the Base Flood Elevation (BFE)and the elevation to which the <br /> structure is to be built and a written statement that the cost of flood insurance will be <br /> commensurate with the increased risk resulting from the reduced reference level <br /> elevation. Such notification shall be maintained with a record of all variance actions. <br /> (H) The Floodplain Administrator shall maintain the records of all appeal actions and report <br /> any variances to the FEMA and the State of North Carolina upon request. <br /> 2.10.5 Additional Criteria for Authorized Variances—Watershed Protection Overlay District <br /> (A) Minor variances for dimensional requirements of the Watershed Protection Overlay <br /> District may be approved by the Board of Adjustment in accordance with Section 2.12 of <br /> this Ordinance. <br /> (B) The Board of Adjustment may approve variance applications to allow the use of off-site <br /> septic easements for lots created before January 1, 1994, and for non-conforming lots of <br /> record. <br /> (C) A description of each project receiving a variance and the reason for granting the <br /> variance shall be submitted for each calendar year to the Division of Water Quality on or <br /> before January 1st of the following year. <br /> (D) All other local governments having jurisdiction within the watershed area and the entity <br /> using the water supply for consumption shall be notified of the variance application at <br /> least 15 days prior to action on the application. The Planning Department shall notify <br /> other local governments via first class mail. <br /> (E) Modifications of the Impervious Surface Ratio <br /> Modifications of the Impervious Surface Ratios may be requested through one of the <br /> following provisions: <br /> (1) Through variance procedures of the Board of Adjustment, as described in this <br /> subsection (2.10.5). <br /> (2) Through approval and recordation of a conservation agreement, as provided in <br /> Article 4 of Chapter 121 of the N.C. General Statutes, between Orange County <br /> and a land owner that prohibits development of land in a protected watershed in <br /> perpetuity. <br /> (a) In such cases, a modification of the required impervious surface ratios <br /> may be approved administratively but only to the extent that additional <br /> land in the same watershed is conserved or protected from development. <br /> In such instances,the land that will be subject to a conservation <br /> agreement must be adjacent to the land proposed for development and <br /> for which a modification of the impervious surface ratios is sought. <br /> Orange County,North Carolina—Unified Development Ordinance Page 2-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.