Browse
Search
Agenda - 03-06-2014 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 03-06-2014 - Regular Mtg.
>
Agenda - 03-06-2014 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 3:53:17 PM
Creation date
2/28/2014 3:52:51 PM
Metadata
Fields
Template:
BOCC
Date
3/6/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 03-06-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 1 <br /> 2 Mothballing of Classroom Wings (photo) <br /> 3 <br /> 4 Mothballing <br /> 5 Objective <br /> 6 — Preservation of Existing Space <br /> 7 Minimum Scope <br /> 8 — Window Replacement <br /> 9 — Roof Replacement <br /> 10 — HVAC <br /> 11 — Fire Alarm <br /> 12 — Smoke Detection <br /> 13 <br /> 14 Mothballing <br /> 15 <br /> 16 Cost <br /> 17 — Additional Cost: $358,700 <br /> 18 Mothball Cost: $579,900 <br /> 19 Mothball Design Fees:$28,800 <br /> 20 Less Deconstruction Budget: ($250,000) <br /> 21 Benefits <br /> 22 — Preserves 21,000 s.f. for future use <br /> 23 — Replacement Cost: $3-4 Million <br /> 24 — 1,100 s.f. Classroom available as Multi-Media Room in Project <br /> 25 — Preserves Historic Appearance <br /> 26 <br /> 27 <br /> 28 John Thomas said the charge was the development of the center section of the existing <br /> 29 building, which represents between 11,000 and 13,000 square feet. He said the simultaneous <br /> 30 charge was to look at the effect of mothballing the areas noted in gray on the maps, in case of <br /> 31 a need for future development. <br /> 32 He said the proposal is to keep or mothball all wings of the facility, and convert the <br /> 33 gravel lot to a paved lot, which will not change the impervious surface. He walked through the <br /> 34 proposed site plan blueprint. He said the memorial site out front would put back the old <br /> 35 flagpole along with information about the old school. <br /> 36 John Thomas reviewed the floor plan and said the goal is to create a lobby out of the <br /> 37 current outdoor walkway, and develop the cafeteria into three main spaces — a small group <br /> 38 room, a large group space, and a recreation room. He said the kitchen would be divided into a <br /> 39 church style kitchen with storage and two restrooms - one available to the kitchen and one to <br /> 40 the exterior ball fields. <br /> 41 He said the gym will be converted into a multipurpose room with some recreational <br /> 42 capabilities. He said the old stage will be closed off with folding walls to allow for use as an <br /> 43 exercise space. <br /> 44 <br /> 45 Commissioner McKee arrived at 7:18 pm. <br /> 46 <br /> 47 John Thomas said there will also be one additional room that was not in the original <br /> 48 charge. He said this room will be developed into a multi-media room appropriate for computer <br /> 49 use, tutoring, or classroom space. <br />
The URL can be used to link to this page
Your browser does not support the video tag.