Browse
Search
2014-148 AMS - Aquatic Resource Group for Sportsplex Pool UV System $91,200
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-148 AMS - Aquatic Resource Group for Sportsplex Pool UV System $91,200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2014 9:13:28 AM
Creation date
2/26/2014 2:40:46 PM
Metadata
Fields
Template:
BOCC
Date
2/26/2014
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
R 2014-148 AMS - Aquatic Resource Group for Sportsplex pool UV system
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 08 1410;43a Aquatic Resource Group 704-583-0730 p•4 <br /> SPEICIFICATIONS <br /> POOL ULTRAVIOLET DISINFECTION EQUIPMENT <br /> 1. GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. Pool ultraviolet disinfection equipment <br /> 1.02 REFERENCES <br /> A. The following latest edition reference specifications, guides and standards shall become part of this Specification <br /> as if herein written. If provisions conflict:the more stringent provisions shall apply. <br /> 1. NSF—National Sanitary Foundation <br /> 2. MET—Met Laboratories, Inc. <br /> 3. CSA—Canadian Standards Association <br /> 4. UL—Underwriters Laboratory <br /> 5. NEMA-National Electrical Manufacturers'Association <br /> 6. ANSI —American National Standards Institute <br /> 7. USEPA UVDGM-U.S. Environmental Protection Agency Ultraviolet Guidance Manual <br /> 1.03 SUBMITTALS <br /> A. Drawings and Instructions <br /> 1. Provide detailed Shop Drawings of the items of equipment being provided, indicating the dimensions, <br /> material and characteristics. <br /> 2. Provide a detailed Operations Manual,embracing the operation functions and recurring maintenance <br /> processes <br /> 1.04 SUBSTITUTIONS <br /> A. Referto General Requirements and Division 01. <br /> 1.05 DELEVERY, STORAGE,AND HANDLING <br /> A. Refer to General Requirements and Division 01. <br /> 1.06 WARRANTY <br /> A. A factory trained representative of the manufacturer shall perform all warranty work. Manufacturer to warranty <br /> Ultraviolet chamber and Spectra Touch Control panel for a period of 5 years excluding lamps, quartz and <br /> seals. Medium pressure Ultraviolet bulbs shall be warranted for a period of 8,000 hours. Intermittently <br /> operated camps(s 1 onloff cycles per day)will be replaced free of charge should failure occur prior to 3,000 <br /> hours and replacement will be prorated between 3,000 and 8,000 hours. <br /> B. Manufacturer must maintain spare or replacement parts in the USA for same day or no longer than next day <br /> delivery. <br /> C. A Service Agreement from a qualified factory certified distributor shall be provided to initiate and maintain the <br /> five year warranty. <br /> ��L <br />
The URL can be used to link to this page
Your browser does not support the video tag.