Browse
Search
Agenda - 02-24-2014 - C7
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 02-24-2014 - Quarterly Public Hearing
>
Agenda - 02-24-2014 - C7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 10:49:24 AM
Creation date
2/17/2014 2:11:36 PM
Metadata
Fields
Template:
BOCC
Date
2/18/2014
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-7
Document Relationships
Minutes 02-24-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The facility shall be removed within 12 months from the date <br />spplicant ceases use of the facility. / <br />(d) Once th astructure is removed the propert e owner shall obtain <br />the necessary ion Control permits to - stabilize the property. The <br />time frame for comp Iesshall be rmined by the Orange County <br />Erosion Control Officer. <br />(e) The owner shall pro financial sec i in form and amount acceptable <br />to the Count ecure the expense of dis ling and removing said <br />structur . <br />(f) on removal of the facility, the Department shall cause a h-otie to be <br />recorded within the Orange County Registrar of Deeds office indiācat<c <br />that the Class A Special Use Permit has been revoked. <br />5.10.1 In <br />The regulations contained herein a to provid afe and efficient integration of <br />facilities necessary for the provision of a it mmunications services through <br />the community with the o fishing reliable wireless service o overnmental <br />agencies sponders in a manner that provides for the public safety and gener <br />citizens. <br />5.10.2 Master Telecommunications Plan ( "Plan ") <br />(A) The Plan is intended to assist providers in their search for suitable locations to build their <br />service network. The County may develop the Plan (map), which would display <br />locations within the County's zoning jurisdiction where property owners have expressed <br />formal, written, interest in allowing construction of telecommunications equipment. <br />(B) Information that may be shown on the base Plan will include, but not limited to: <br />(1) <br />Existing towers, <br />(2) <br />Major transmission lines, <br />(3) <br />County- defined Natural Areas, <br />(4) <br />Historic properties, <br />(5) <br />Scenic corridors, <br />(6) Known bird migratory patterns through the County, <br />(7) Voluntary Agricultural Districts, and <br />(8) Publicly -owned or quasi - public lands. <br />(C) In order to participate in the Plan, all owner(s), or their legally binding representatives, <br />shall submit an application on a form prepared by the Planning Department requesting <br />inclusion. <br />(D) All telecommunication providers who elect to construct facilities on properties in the Plan <br />shall provide all necessary and requested information to the County's <br />telecommunications consultant. <br />(E) Modification of the Plan may be considered aRR61ally at the February Quarterly 126ibliG <br />at any of the meetings <br />321 <br />Return to Agenda <br />
The URL can be used to link to this page
Your browser does not support the video tag.