Browse
Search
Agenda - 02-24-2014 - C6
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 02-24-2014 - Quarterly Public Hearing
>
Agenda - 02-24-2014 - C6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 10:52:36 AM
Creation date
2/17/2014 2:05:42 PM
Metadata
Fields
Template:
BOCC
Date
2/18/2014
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C6
Document Relationships
Minutes 02-24-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
273 <br />(ii) A specific statement of the goals and objectives, i.e., exactly <br />what steps will be taken to compensate for lost habitat, etc.; <br />(iii) Detailed descriptions in the form of grading plans, construction <br />plans, and planting plans to illustrate how the objectives will be <br />carried out; <br />(iv) A monitoring and maintenance plan to measure success of the <br />mitigation based on stated objectives. Include a list of parties <br />responsible for monitoring and maintenance, a schedule for <br />each, and how results will be reported to the Planning and <br />Inspections Department; <br />(v) A plan showing how the site will be protected from impacts by <br />human and unwanted animal intrusion, alternate plant species <br />and construction methods that could be used in the event <br />adjustments or substitutions are needed until the mitigation area <br />is established; and <br />(vi) A financial guarantee is required for the total cost of the <br />mitigation project Once the installation is complete, 30% of the <br />amount of the letter of credit or escrow will be held for 12 months <br />or until the site is established, whichever is greater. <br />(d) Traffic Study <br />(i) A traffic impact study is required with all applications for the <br />following: <br />a. Subdivisions with more than 40 lots outside of transition <br />areas, and <br />b. Subdivisions with more than 80 lots within transition <br />areas. <br />(ii) The study shall include an analysis of the need for public road <br />improvements, including pedestrian- oriented enhancements, for <br />on -site and off -site improvements as said improvements relate to <br />the level of service impacted by the development. <br />(iii) The traffic impact study shall be prepared in accordance with the <br />requirements of Section 6.17. <br />(3) Standards of Evaluation <br />(a) The project meets all applicable design standards and other <br />requirements of this Ordinance. <br />(b) The project meets all service provision criteria as set forth below: <br />(i) Fire — identifies the primary and secondary responders and the <br />source(s) of water. <br />(ii) Police — identifies the primary and secondary responders. <br />(iii) Rescue services — identifies the primary and secondary <br />responders. <br />(iv) Water Supply — source and capacity of water supply <br />(v) Wastewater Treatment Methods — provider and capacity of <br />wastewater treatment source. <br />Section number (c) Habitats shall be identified and evaluated in the biological inventory <br />update ==> required by Section 5.4-517.6(A)(2)(b)and are subject to the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.