Browse
Search
Agenda - 02-24-2014 - C6
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 02-24-2014 - Quarterly Public Hearing
>
Agenda - 02-24-2014 - C6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 10:52:36 AM
Creation date
2/17/2014 2:05:42 PM
Metadata
Fields
Template:
BOCC
Date
2/18/2014
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C6
Document Relationships
Minutes 02-24-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
264 <br />5.13.7 <br />5.13.8 <br />(A) <br />(A) <br />(a) The amount of water anticipated to be used on a daily, weekly, monthly, <br />and annual basis; <br />(b) An analysis of the amount of groundwater withdrawal considered to be <br />safe and sustainable in the immediate vicinity; and <br />(c) An analysis of whether other wells in the vicinity of the proposed use will <br />be affected by withdrawals made by the proposed use. <br />rative Farm Stand <br />General Standards for Evaluation <br />(1) If located in an AR or RB zoning district, stand shall be located on the bona fide <br />farm of one of the cooperative farm partners. <br />(2) In addition to the application materials required in Sections 2.5.2 and 2.4.3, the <br />following shall also be required: <br />(a) The number of location of participating cooperative farm partners. <br />(b) A description of the facility, including size of structure(s) and access <br />locations. <br />(c) Number of employees, if any. <br />(d) Frequency and hours of operation. <br />(3) Sales of any products not produced on the farm(s) of one of the cooperative farm <br />partners shall be incidental, related to, and a subordinate component of farm <br />stand sales in scale and profit. <br />•ian Center <br />Standards for Class A Special Use Permit or ASE -CZ Zoning District <br />(1) Minimum lot size: 15 acres. <br />(2) Site shall have direct access to major road, as classified in the Orange County <br />Comprehensive Plan, and shall use said road as the primary access, unless <br />approved otherwise in the permit. <br />(3) All structures, facilities, storage areas, and parking areas shall be setback a <br />minimum of 100 feet from all property lines. <br />(4) Parking area(s) shall include sufficient space for parking and maneuvering trucks <br />and horse trailers. <br />(5) Loudspeakers and public address systems shall not be used before 7 a.m. or <br />after 7 p.m. if an existing residence is located within 1,000 feet of the facility, <br />unless approved otherwise in the permit. <br />(6) All unpaved areas shall be maintained in a manner which prevents dust from <br />adversely impacting adjacent properties. <br />(7) Application materials shall include a comprehensive groundwater study, for <br />facilities expected to use more than 240 gallons of groundwater per day per acre <br />of lot area. Said study shall detail: <br />(a) The amount of water anticipated to be used on a daily, weekly, monthly, <br />and annual basis; <br />(b) An analysis of the amount of groundwater withdrawal considered to be <br />safe and sustainable in the immediate vicinity; and <br />(c) An analysis of whether other wells in the vicinity of the proposed use will <br />be affected by withdrawals made by the proposed use. <br />
The URL can be used to link to this page
Your browser does not support the video tag.