Browse
Search
Agenda - 02-24-2014 - C6
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 02-24-2014 - Quarterly Public Hearing
>
Agenda - 02-24-2014 - C6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 10:52:36 AM
Creation date
2/17/2014 2:05:42 PM
Metadata
Fields
Template:
BOCC
Date
2/18/2014
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C6
Document Relationships
Minutes 02-24-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
261 <br />(vi) <br />Number of student parking spaces; <br />(vii) <br />Location of student drop off points with stacking spaces <br />identified; <br />(viii) <br />Location of all proposed and future athletic fields and structures, <br />including: <br />a. Total number of seats for spectators, and <br />b. Location of concession stands, if any anticipated; <br />(ix) <br />Proposed public roadway improvements; and <br />(x) <br />Existing and proposed infrastructure improvements (water and <br />sewer). <br />(b) 26 copies of a Landscape and Tree Preservation Plan prepared in <br />accordance with Section 6.8 of this Ordinance. <br />(c) 26 copies of photometric plans prepared in accordance with Section 6 11 <br />of this Ordinance. <br />(d) Estimated water usage for structures, landscaping and athletic fields. <br />(e) A Traffic Impact Study, as required by Section 6.17 of this Ordinance. <br />Section number (f) A Biological Inventory, prepared in accordance with Section <br />update 5.4517.6(A)(2)(b)of this Ordinance. <br />(g) A Resources Management Plan, prepared in accordance with the <br />Resources Management Plan definition in Article 10 of this Ordinance. <br />(2) Standards of Evaluation Within Economic Development Districts (EDD) <br />If located within an EDD, the application must meet the EDD design standards <br />established in Article 6 of this Ordinance. <br />(3) Standards of Evaluation in Zoning Districts other than an Economic <br />Development Districts (EDD) <br />If located within a zoning district other than an EDD, the applicant must meet the <br />following Standards of Evaluation: <br />(a) The project meets all applicable design standards and other <br />requirements of this Ordinance. <br />(b) The project meets all service provision criteria as set forth below - <br />(i) Fire — identifies the primary and secondary responders and the <br />source(s) of water. <br />(ii) Police — identifies the primary and secondary responders. <br />(iii) Rescue services — identifies the primary and secondary <br />responders. <br />(iv) Water Supply — identification of public or private utility source <br />and capacity of water supply or identification of water source <br />through a water resource study. <br />(v) Wastewater Treatment Methods — provider and capacity of <br />wastewater treatment source. <br />(vi) Solid Waste —as specified in subsection (h) below. <br />(c) Habitats shall be identified and evaluated in the Biological Inventory and <br />are subject to the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.