Browse
Search
Agenda - 02-24-2014 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 02-24-2014 - Quarterly Public Hearing
>
Agenda - 02-24-2014 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 9:29:50 AM
Creation date
2/17/2014 12:36:04 PM
Metadata
Fields
Template:
BOCC
Date
2/18/2014
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C2
Document Relationships
Minutes 02-24-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBMITTAL INFORMATI; " Per Section 2.7.3 of the Unified D lopment Ordinance (UDO), all <br />Class A Special Use Permit applications are required to submit the following: <br />1) 26 copies of a site plan prepared by a registered North Carolina land surveyor, Iandscape architect, architect, or <br />engineer containing all required information detailed within Section 2.5 of the UDO. This site plan will also need to <br />contain all relevant information demonstrating that the proposed special use compliance with all general and specific <br />standards governing the proposed special use as detailed within Article(s) 5 and 6 of the UDO. <br />2) A detailed narrative outlining the proposed land use including operational requirements, the location of facility, <br />appearance, etc., <br />3) Documentation establishing compliance with Section 5.3.2 inclusive of the UDO. <br />4) The names and addresses of the owners involved with the project, <br />5) A list of property owners within 500 feet of the subject parcel and the name and address of each property owner, as <br />currently listed in the Orange County tax records, <br />6) Elevations of all structures proposed to be used in the development., <br />7) 26 copies of the Environmental Assessment and/or Environmental Impact Statement if required by Section 6.16 of the <br />UDO, <br />8) Statement outlining the anticipated development schedule for the completion of the project, <br />** NOTE: It should be remembered that the review of all specW use permit applications /modifications <br />are carried out in a quasi-judicial format meaning that decisions relating to the approval or denial of an <br />application are based solely on the sworn testimony of all parties involved with the case, both those for <br />and against an application, as well as the review of competent material and substantial evidence <br />submitted during the public hearing. <br />Further the applicant has the burden of establishing, by the submission of competent material and <br />substantial evidence, the existence of facts and conditions that demonstrate the projects compliance with <br />the various requirements and standards detailed within the Unified Development Ordinance. ** <br />I (we), the undersigned, have been made aware of the process for the review and action associated with a <br />Class A Special Use Permit application and understand that only completed applications, containing all <br />information required by the Orange County UDO shall be reviewed and acted upon by the County. <br />I (we) understand that it shall be my (our) responsibility to present evidence to the County in the form of <br />sworn testimony, exhibits, documents, models, plans, and the like support the request for approval of the <br />Class A Special Use Permit. <br />Further I (we) understand that any assistance I (we) may receive from County staff in preparing this <br />application in no way guarantees a favorable recommendation by staff on the merits of this proposal nor does <br />it guarantee an approval of the request by the County. <br />v cr <br />Applicant Date: <br />Applicant Date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.