Browse
Search
Agenda - 02-24-2014 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 02-24-2014 - Quarterly Public Hearing
>
Agenda - 02-24-2014 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 9:29:50 AM
Creation date
2/17/2014 12:36:04 PM
Metadata
Fields
Template:
BOCC
Date
2/18/2014
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C2
Document Relationships
Minutes 02-24-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br />will occur as a result of this project. At the completion of construction, the <br />entire site will be seeded to create a good stand of grass. <br />The typical construction schedule for these standard farms is limited to <br />three months. Energy generated by the farm will be distributed to Duke <br />Energy customers. <br />2. Number of lots: <br />3. Number of structures: <br />4. Estimated square footage of area to be graded for development of attached <br />residential units (excluding roads, but including parking areas): 0 <br />5. Estimated square footage of area to be graded for non - residential use <br />(excluding roads) Approx. 3,270 sf (Inverter Pad areas) <br />0 <br />Estimated area to be graded for roads 0 <br />7. Road Type: Public N/A Private <br />Class A N/A <br />Class B N/A <br />8. Hours of operation for commercial or industrial use: <br />The solar farm will operate year round and generate electricity during <br />daylight hours. The facility will be monitored remotely. Security and <br />minimum maintenance are the only periodic activities anticipated Daily <br />operation does not require permanent on -site employees <br />B. State Permits Required: <br />1. Does the project involve the mining of earth products? <br />If so, how many cubic feet of material are expected to be excavated? <br />No — N/A <br />Has an application for a Mining Permit been submitted to NCDRCD? <br />
The URL can be used to link to this page
Your browser does not support the video tag.