Browse
Search
Agenda - 02-18-2014 - 6h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 02-18-2014 - Regular Mtg.
>
Agenda - 02-18-2014 - 6h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 10:34:10 AM
Creation date
2/17/2014 11:15:11 AM
Metadata
Fields
Template:
BOCC
Date
2/18/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6h
Document Relationships
2014-144 Solid Waste - Waste Industries LLC for Urban Curbside Recycling Service $3,900,000
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2014
Minutes 02-18-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
77 <br />Equipment List <br />Our proposal includes 2 new Autocar compressed natural gas powered chassis, equipped with <br />Heil fully automated body trucks and 2 new Autocar compressed natural gas powered chassis <br />equipped with G &S semi- automated body trucks for recycle collection. Also, we will utilize a <br />2012 Chevrolet pickup equipped with a Perkins 6yd dump bed insert with tipper on the narrow <br />streets with difficult collection points, areas with on- street parking, and for Southern Village <br />to accommodate their narrow alleys. <br />It is our intent to have new CNG trucks in place for the July 1 start date. Depending on the <br />award date and due to the complexity and extended build time of the compressed natural gas <br />powered trucks it will take longer to receive than the standard diesel powered equipment. In <br />the event that the CNG trucks do not arrive by July 1 we will utilize new trucks, which were <br />designated as replacements throughout the company, to service the contract until we receive <br />the new trucks. <br />Our back -up trucks will consist of 2 - 2012 Autocar compressed natural gas powered trucks <br />with G&S semi - automated bodies, pictured below. <br />4 MOVIE, <br />
The URL can be used to link to this page
Your browser does not support the video tag.