Orange County NC Website
77 <br />Equipment List <br />Our proposal includes 2 new Autocar compressed natural gas powered chassis, equipped with <br />Heil fully automated body trucks and 2 new Autocar compressed natural gas powered chassis <br />equipped with G &S semi- automated body trucks for recycle collection. Also, we will utilize a <br />2012 Chevrolet pickup equipped with a Perkins 6yd dump bed insert with tipper on the narrow <br />streets with difficult collection points, areas with on- street parking, and for Southern Village <br />to accommodate their narrow alleys. <br />It is our intent to have new CNG trucks in place for the July 1 start date. Depending on the <br />award date and due to the complexity and extended build time of the compressed natural gas <br />powered trucks it will take longer to receive than the standard diesel powered equipment. In <br />the event that the CNG trucks do not arrive by July 1 we will utilize new trucks, which were <br />designated as replacements throughout the company, to service the contract until we receive <br />the new trucks. <br />Our back -up trucks will consist of 2 - 2012 Autocar compressed natural gas powered trucks <br />with G&S semi - automated bodies, pictured below. <br />4 MOVIE, <br />