Orange County NC Website
3 <br /> $15,000. For bulk, palletized storage, an oversized door could be installed at the north wing <br /> entrance, allowing for cargo truck/lift gate deliveries into the north wing entrance. This feature <br /> could be installed for an estimated cost of$10,000. <br /> Option B- Fully Pro_-grammed Space. <br /> The cost to convert the wings to fully programmed space involves major investments in the <br /> septic system upgrade to allow for the additional required wastewater flow as well as the interior <br /> space upfit (to include an expansion of the proposed Community Center HVAC system) that <br /> would provide comfortable office, meeting and services areas necessary for programmable <br /> space. <br /> Septic Upgrade: MBAJ Architects and their engineering sub-consultants reviewed the <br /> construction documents and state that the system as designed is adequate for up to 7,000 <br /> gallons of daily flow. Full capacity design is estimated not to exceed $800,000, which includes <br /> adequate contingency for unforeseen conditions. <br /> This system was originally conceived and designed for the Board's consideration for installation <br /> from the early 2000s through 2009. The Board chose not to pursue the additional 7,000 gallons <br /> of daily flow to support the rapidly declining occupancy and programming of the facility. <br /> Upfit: A full occupancy upfit is estimated at $100 per square foot. The estimated full cost for <br /> this upfit, which includes the expanded Community Center HVAC system, is $2,100,000. <br /> FINANCIAL IMPACT: The Board approved the FY2012-17 Capital Investment Plan ("CIP") <br /> that included $250,000 in FY 2012-13 for deconstruction of sections of the facility in preparation <br /> for the future use on the site. The Board also approved $2.0 million in FY2014-15 for the <br /> design and construction of the new facility that, when combined with the $250,000 authorized in <br /> FY 2012-13, brings the total project capital budget to $2,250,000. The following illustration <br /> outlines the costs associated with the alternatives discussed. <br /> Option A - Storage Use, additional classroom space (No septic upgrade) <br /> Estimated Current Surplus/(Deficit) <br /> Cost Revenues Appropriations <br /> Cedar Grove Project $2,000,000 $2,250,000 $2,250,000 $250,000 <br /> Classroom Wing "Mothball" $28,800 $0 $0 ($28,800) <br /> Design Fee <br /> Classroom Wing "Mothball" $579,900 $0 $0 ($579,900) <br /> Estimated Construction Cost* <br /> Classroom Wing Storage $15,000 $0 $0 ($15,000) <br /> Upgrade Estimated Cost <br /> Palletized Storage Opening $10,000 $0 $0 ($10,000) <br /> Additional Classroom Space $29,000 $0 $0 ($29,000) <br /> Upi t Estimated Cost <br /> Totals: $2,662,700 $2,250,000 $2,250,000 ($412,700) <br /> *Annual operating costs for storage option are estimated between $3,000 and $6,000 <br /> Option A would require an additional appropriation of approximately $412,700 for the <br /> project. <br />