Browse
Search
Agenda - 02-11-2014 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 02-11-2014 - Budget Work Session
>
Agenda - 02-11-2014 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 10:17:43 AM
Creation date
2/7/2014 3:33:52 PM
Metadata
Fields
Template:
BOCC
Date
2/11/2014
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 02-11-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County NC 29 <br /> Radio Communication Tower and System Infrastructure Upgrade <br /> RF Coverage and Sites/Towers <br /> 2.2 VHF Station Paging <br /> 2.2.1 Cedar Grove Fire Station <br /> An existing tower at this location could be used for a VHF paging station. <br /> The tower is approximately 175 ft. tall, and has two antennas and transmission lines <br /> installed. The latest information from Orange County indicates that neither of these <br /> antennas or transmission lines is in use. <br /> If an existing antenna and transmission line is used for the new VHF paging station, a <br /> structural analysis of the tower should not be necessary. However, depending on the <br /> age of the tower, a tower inspection and structural analysis would be recommended. <br /> If an existing antenna and transmission line is used for the new VHF paging station, the <br /> antenna and transmission line should be tested for acceptable performance. The <br /> antenna and line should be "swept" with a time domain reflectometer (TDR). This will <br /> provide an indication of acceptable performance as well as provide a baseline for future <br /> testing and verification. <br /> 2.2.2 Orange Grove Fire Station <br /> A new tower is proposed for the Orange Grove Fire Station to provide VHF paging <br /> coverage in the central southwest of the County. <br /> Based on the RF coverage requirements, a tower height of at least 130 ft. is needed for <br /> Fire Station paging. To allow for future expansion and other use of the tower, Orange <br /> County may consider a tower of greater height. <br /> Initial review of the Unified Development Ordinance indicates that to meet a 110% fall- <br /> zone for the tower, the new tower would be limited to 100 ft. If Orange County could <br /> secure approvals from the adjacent land owners, this fall-zone may be extended onto <br /> their properties, and the tower height increased. <br /> A full tower elevation and UDO Report is attached as a separate document. <br /> 2.2.3 Eno Mountain Site <br /> The existing Fire Station paging station at this site should be continued to be used as <br /> part of the overall County VHF paging system. <br /> August 30, 2013 Page 28 of 51 � a <br /> e -. <br />
The URL can be used to link to this page
Your browser does not support the video tag.