Orange County NC Website
U.S. 70, construct a sidewalk along the south side of Harold Latta Road from <br /> Cloverfield Drive to Orange Grove Road, install high visibility crosswalks and in-road <br /> signage at school entrances and exits on Orange Grove Road, and construct a <br /> sidewalk along entrance roads to CW Stanford Middle School. <br /> This project will be submitted as a new pedestrian project for consideration of inclusion <br /> in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. The <br /> project will be submitted as a Safe Routes to School (SRTS)-eligible project; however, if <br /> it is not funded as an SRTS project, the County will be required to commit a 20% local <br /> match. <br /> 5 South Churton Street (Old NC 86) Improvements: Widen South Churton Street (SR <br /> 1009) from 1-40 to U.S. 70 Business to multiple lanes with congestion management, <br /> limited access, bicycle and pedestrian, and aesthetic improvements. <br /> This project will be submitted as a reprioritized highway project to be considered for <br /> inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 <br /> STIP. <br /> 6 U.S. 70 East/1-85 Connector: Modify the 1-85 Connector (SR 1239) interchange at U.S. <br /> 70 to provide access from all directions. <br /> This project will be submitted as a reprioritized highway project to be considered for <br /> inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 <br /> STIP. <br /> 7 Orange Grove Road Extension: Extend Orange Grove Road (SR 1006) from the east <br /> side of South Churton Street (SR 1009) to U.S. 70 Business. <br /> This project will be submitted as a reprioritized highway project to be considered for <br /> inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 <br /> STIP. <br /> 8 NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north <br /> of NC 57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC <br /> 57. <br /> This project will be submitted as a reprioritized highway project to be considered for <br /> inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 <br /> STIP. <br /> 9 Park-and-Ride Improvements in Hillsborough (Conceptual): Implement park-and-ride <br /> improvements in Hillsborough for cross-county, fixed-route service between Mebane <br /> and Durham. <br /> This project will be submitted as a new transit project to the DCHC MPO for <br /> consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as <br /> the 2016-2022 STIP. The project's official submission must be made by Triangle <br /> Transit. <br />