Browse
Search
ORD-2014-001 Ordinance Amending the Unified Development Ordinance of Orange County incorporating State Law related changes to the Board of Adjustment
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2014
>
ORD-2014-001 Ordinance Amending the Unified Development Ordinance of Orange County incorporating State Law related changes to the Board of Adjustment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:56:08 PM
Creation date
1/27/2014 12:16:22 PM
Metadata
Fields
Template:
BOCC
Date
3/6/2014
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6f
Document Relationships
Agenda - 01-23-2014 - 5a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 01-23-2014 - Regular Mtg.
Agenda - 03-06-2014 - 6f
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-06-2014 - Regular Mtg.
Minutes 01-23-2014
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
Minutes 03-06-2014
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures <br />Section 2.7: Special Use Permits <br />(B) The following criteria shall constitute a modification: <br />(1) Any change in a condition imposed during the approval of a special use permit. <br />(2) Any change in use or enlargement of approved use. <br />(3) Any increase in intensity of use. An increase in intensity of use shall be <br />considered to be an increase in usable floor area and /or an increase in the <br />number of dwelling or lodging units. <br />(4) Structural alterations which significantly affects the basic size, form, style, <br />ornamentation, and /or character of the building as shown on the approved site <br />plan or described in the applicant's narrative. <br />(5) Substantial change in the amount and /or location of open space, recreation <br />facilities or landscape screening. <br />(6) Any increase in the size or number of approved signs. <br />(7) Any change in parking areas resulting in an increase or reduction of 5% or more <br />in the number of spaces approved. <br />(8) Substantial changes in pedestrian and /or vehicular access or circulation. <br />(9) Any change in a setback required by the provisions of this Ordinance or imposed <br />as a condition of approval. <br />1( 0) Any change in the location or extent of street and utility improvements or rights - <br />of -way, including water, sewer and storm drainage facilities, which would provide <br />a different level of service. <br />(11) For telecommunication facilities, a modification shall also include the following:' <br />ip -94(a) An increase in the existing vertical height of the structure by more than: <br />(i) 10% in the height of the tower, or <br />The height of 1 additional antenna with separation from the <br />nearest existing antenna not to exceed 20 feet <br />W(t) _A substantial change to the physical dimensions of the <br />wireless support structure which alters facts or conditions <br />relied upon by the County when granting the original permit. <br />It shall be the County's burden to demonstrate that such a <br />scenario constitutes a substantial change to the physical <br />dimensions of the wireless support structure.2 <br />(c) The addition of an appurtenance to the body of the telecommunication <br />facility that protrudes horizontally from the edge of the wireless support <br />structure the greater of: <br />(i) More than 20 feet or <br />a-(ii) More than the width of the wireless support structure at the level <br />of the appurtenance. <br />Except where necessary to shelter the antenna from inclement <br />weather or to connect the antenna to the tower via cable.3 <br />' Staff has added language from the Session Law into this Section of the UDO to further detail what constitutes a <br />`modification' to a telecommunication facility. <br />2 Language recommended by the County Attorney's office clarifying when a change in tower height constitutes a <br />`modification' requiring Board review submitted to staff on December 4, 2013. <br />3 This additional language is taken directly from NCGS 153A- 349.51 (7a) at the request of the County Attorney's <br />office. <br />Orange County, North Carolina — Unified Development Ordinance Page 2 -21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.