Browse
Search
ORD-2014-001 Ordinance Amending the Unified Development Ordinance of Orange County incorporating State Law related changes to the Board of Adjustment
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2014
>
ORD-2014-001 Ordinance Amending the Unified Development Ordinance of Orange County incorporating State Law related changes to the Board of Adjustment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 2:56:08 PM
Creation date
1/27/2014 12:16:22 PM
Metadata
Fields
Template:
BOCC
Date
3/6/2014
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6f
Document Relationships
Agenda - 01-23-2014 - 5a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 01-23-2014 - Regular Mtg.
Agenda - 03-06-2014 - 6f
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 03-06-2014 - Regular Mtg.
Minutes 01-23-2014
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
Minutes 03-06-2014
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses <br />Section 5 10- Standards for Telecommunication Facilities <br />Some or all of items listed in (h) through (r) may be required to be provided on a <br />propagation study data form to be provided by the County. <br />(2) Additional Submittal Requirements — Go- IesatienCol location 6 of Antennas <br />In addition to the requirements denoted herein, applications for the ee- <br />lesat+encollocation of antennas on existing structures shall be required to submit <br />the following: <br />(a) The age of the existing tower in years, including the date of the grant of <br />the original permit or authorization for the existing tower; <br />(b) For a wireless support structure that is five years old or older, or for a <br />guyed structure that is three years old or older, a copy of the latest ANSI <br />Report done pursuant to the latest edition of ANSI -EIAMA 222F — Annex <br />E for any self - supporting tower. If an ANSI report has not been done <br />pursuant to the preceding schedule, an ANSI report shall be done and <br />submitted as part of the application. No Building Permit shall be issued <br />for any wireless support structure where the structure being attached to <br />is in need of remediation, unless and until the County Planning and <br />Inspections Department has approved all remediation work needed has <br />been completed or a schedule for the remediation work. <br />(c) A Structural Report signed by a Professional Engineer licensed to do <br />business in the State and bearing that engineer's currently valid stamp, <br />showing the structural adequacy of the wireless support structure to <br />accommodate the proposed modification or antenna array Collocation, <br />including any equipment shelter, unless the equipment shelter is located <br />on the lowest floor of a building; <br />(d) If attaching to a structure other than a tower or where the proposed <br />attachment is within 30 feet of areas to which the public has or could <br />reasonably have or gain access to, documentation shall be provided, <br />including all calculations, proving that the potential exposure to RF <br />radiation (i.e Non -Ion Emitting Radiation), will be comply with the most <br />recent FCC regulations governing RF radiation and exposure thereto, <br />and further denoting the minimum distance from any antennas an <br />individual may safely stand without being exposed to RF radiation in <br />excess of the FCC's permitted standards and any portion(s) of the <br />structure that would be exposed to RF radiation in excess of the FCC's <br />permitted standards. Compliance with the FCC's regulations, in such an <br />instance the RF radiation from all facilities at that location shall be <br />included in the calculations to show the cumulative effect on any area of <br />the building or structure deemed accessible by the public or workers. <br />Such report or analysis shall be signed and sealed by a Professional <br />Engineer licensed in the State. <br />(e) If the modification or antenna array Gellesatiea - collocation 7 i 30 feet or <br />more above ground level, then a signed document such as the FCC's <br />"Checklist to Determine whether a Wireless support structure may be <br />Categorically Excluded" shall be provided to verify that the modification <br />or antenna array es- lec-at+encollocation will fully comply with the current <br />FCC's RF emissions regulations. If not categorically excluded, a <br />complete RF emissions study is required to enable compliance <br />verification, including providing all calculations so that such may be <br />verified prior to issuance of a Building Permit; <br />If any section or portion of the structure to be attached to is not in <br />compliance with the FCC's regulations regarding RF radiation, that <br />6 Correction of spelling to ensure consistency within the UDO. <br />' Correction of a grammatical error. There is no need for the word to be capitalized. <br />Orange County, North Carolina — Unified Development Ordinance Page 5 -87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.