Browse
Search
Agenda - 01-28-2014 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 01-28-2014 - Work Session
>
Agenda - 01-28-2014 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 8:43:30 AM
Creation date
1/24/2014 3:54:22 PM
Metadata
Fields
Template:
BOCC
Date
1/28/2014
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County NC <br />Radio Communication Tower and System Infrastructure Upgrade <br />RF Coverage and Sites /Towers <br />Address: 7505 New Sharon Church Rd. <br />Coordinates: 36 -11- 25.05, 78 -58 -31.78 <br />Tower Type: Monopole <br />Tower Height: 195 ft. <br />Proposed VIPER antenna heights: <br />• 1 -800 MHz Tx antenna — DB809 (max 12.2 ft.), 130 ft. centerline <br />• 1 -800 MHz Tx transmission line — 1 '/4 inch <br />• 1 -800 MHz Rx antenna — DB809 (max 12.2 ft.), 150 ft. centerline <br />• 1 -800 MHz TTA — 16 "H x 12 "W x 7.5 "D, 39 #, 384 ft. (or close to base of Rx antenna) <br />• 1 -800 MHz Rx transmission line — 7/8 inch <br />• 1- Microwave dish - Comscope WHP6- 65- P1A/K, 6 ft., 177 or 75 ft. level, azimuth <br />[Laws, Eno] <br />• 1- Microwave transmission line — EWP63S jacketed, approx.1" x 2" elliptical <br />waveguide <br />Site Contact: American Tower (ATC) <br />This site could provide 800 MHz VIPER coverage in the south - central portion of the <br />County. <br />FE investigations show that this site, #42 on the County Telcom List, is now owned by <br />Crown Castle. <br />In the event that no space is available in the shelter, or the carrier prohibits use of the <br />carrier's shelter by others, Orange County will need to procure and install a shelter for <br />its own use. Orange County may also be required to procure and a generator with <br />associated fuel tank. <br />800 MHz RF coverage has been predicted from this site, and is shown in Figures 3 <br />through 8, which can be found in Section 2.1.7. <br />The County should consider pursuing use of this tower. <br />August 30, 2013 Page 6 of 51 <br />B <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.