Browse
Search
Agenda - 01-23-2014 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 01-23-2014 - Regular Mtg.
>
Agenda - 01-23-2014 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 10:01:47 AM
Creation date
1/24/2014 2:47:59 PM
Metadata
Fields
Template:
BOCC
Date
1/23/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
2014-129 Library - Freelon Group Architects for Southern Branch Library Facilitation
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2014
Minutes 01-23-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Accessibility for vehicles <br />• Accessibility for public transportation <br />• <br />Design capacity and existing traffic load of roadway proposed to access site, <br />Alignment with Planning Tools (Comprehensive Plan): <br />Alignment with planning tools applicable for the subject property (County Comprehensive <br />Plan, adopted Small Area Plans, Strate.gic Plans, etc.) <br />Lease versus Purchase: <br />• Analysis of the long term viability of the site <br />• Availability of property for lease <br />Centrality of Location: <br />• Existing and potential future population in a given area <br />• Growth and development opportunities /constraints in a given area (i.e. what is future <br />development, as embodied in applicable plans, going to look like and how will it <br />impact the proposed library) <br />• Proximity to schools <br />• Proximity to retail <br />• Proximity to other libraries <br />Site Conditions, Allowances, and Constraints:- <br />• The cost - benefit conclusions of physical, legal, and land -use allowances /constraints <br />• Technical and environmental assessments (planning /zoning, jurisdictional processes, <br />etc.) <br />• Environmentally sustainable (C &A, storm water mgt, buffers, energy "net zero" <br />capacity) <br />• Operationally sustainable <br />• Defeats obsolescence <br />Cost and Availability: <br />• Cost for site acquisition <br />• Availability of property for lease <br />• Analysis of long term viability of site <br />• Timeframe for development of the site <br />• Terms for site control necessary for development process <br />
The URL can be used to link to this page
Your browser does not support the video tag.