Browse
Search
Agenda - 01-23-2014 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 01-23-2014 - Regular Mtg.
>
Agenda - 01-23-2014 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 10:01:47 AM
Creation date
1/24/2014 2:47:59 PM
Metadata
Fields
Template:
BOCC
Date
1/23/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
2014-129 Library - Freelon Group Architects for Southern Branch Library Facilitation
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2014
Minutes 01-23-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />INSURANCE <br />The successful respondent will be required to show proof of professional liability insurance in <br />types and amounts satisfactory to the County. The County typically requires liability limits of at <br />least $1,000,000 per occurrence with a $2,000,000 aggregate coverage. Exact limits would be <br />determined during contract negotiations. <br />Respondents will also cite in their response, any and all claims that have been filed against the <br />professional liability insurance carried by the respondent within the past ten years, regardless of <br />the settlement disposition. <br />VI. STATEMENT OF QUALIFICATIONS REQUIREMENTS <br />In order to expedite the evaluation of proposals, each Respondent shall organize its <br />qualification package in accordance with this section. Firms that do not follow the specified outline <br />may be deemed non - responsive and may be disqualified from the evaluation process. <br />Section 1. Cover letter confirming that the elements of the RFQ have been reviewed and <br />understood. The cover letter should be signed by an individual authorized to bind the <br />firm contractually. It should include: Firm name, address, telephone, fax number, <br />contact person and e-mail address; year established and former firm names; Include <br />names of principles of the firm and the states in which they are registered; and types of <br />services for which the firm is qualified; <br />Section 2: Experience: Understanding of the scope of work/services; more <br />specifically experience programming and designing public libraries and facilitating <br />public assessment process for libraries in urban, suburban, and rural <br />environments. <br />List and describe all of your firm's previous experience in the planning, design and <br />construction of projects similar in nature to the one for which this Request for <br />Qualifications is being sought. For each project listed, the information should include: <br />• Name and location of the project <br />• Brief description of the project <br />• Date the project was completed <br />• Name and telephone number of owner <br />Section 3. Project Team: List of staff members and resumes of those persons who will be assigned <br />to work with the County on the project. Include an Organizational Chart but do not <br />include resumes or list of personnel who will not be assigned to this project. Also <br />include the firm's commitment to keep the originally- assigned project team through <br />project completion. <br />Section 4: List of current ongoing projects. Include: Project start date; expected completion date; <br />total project cost; your ability to devote staff resources to complete this project. Describe <br />how other existing trips to the area could contribute to cost savings on the services <br />sought within this RFQ. <br />Section 5: Names of outside consultants (sub - consultants) who would be retained to provide <br />services required for these projects. Provide a one -page synopsis for each consultant to <br />include the following information: <br />• Individual's proposed role in the project <br />• A resume or brief description of the individual's previous experience <br />Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.