Orange County NC Website
ATTACHMENT 5 <br /> 35 <br /> 1 b. Fbview and approval of a Prospectus for transportation planning which defines <br /> 2 work tasks and responsibilities for the various agencies participating in the <br /> 3 transportation planning process; <br /> 4 <br /> 5 c. Fbview and approval of the transportation Unified Planning Work Program; <br /> 6 <br /> 7 d. Review and approval of changesto the National Highway 9pstem,Functional <br /> 8 Classification,and Metropolitan,PlanningAreaboundary; Comment[BE1s]:Old MOU includes"urban <br /> area boundary" Urbanized area set by Census, <br /> Smoothed UZA no longer necessary. <br /> 10 e. Fbview and approval of the Comprehensive and Metropolitan Transportation <br /> 11 Plans. As specified in General Statutes Section 136-66.2(a),the Cbmprehensive <br /> 12 Transportation Plan shall include the projects in the Metropolitan Transportation <br /> 13 Plan and may include additional projectsthat are not included in the financially - Comment[BE201:Changed from"as well as"in <br /> 14 constrained plan or are anticipated to be needed beyond the horizDn year as response to NCDOT comment <br /> 15 required by 23 U,SC Section 134. As specified in General Statutes Section 136- <br /> 16 66.2(d)revisionsto the Comprehensive Transportation Ran Oro required to be - Comment[BE211:Changed from"may be"in <br /> 17 jointly approved by the North Carolina Department of Transportation and the response to NCDOT comment. <br /> 18 M PO Board;l Comment[BE221:Updated to reflect current <br /> 19 names of plans and legislation. <br /> 20 f. Fbview and approval of the Transportation Improvement Program and changes <br /> 21 to the Transportation Improvement Program. �sspecified in 23 U.SC Section <br /> 22 134(k),all federally funded projectscarried out within the boundariesof a <br /> 23 metropolitan planning area serving atransportation management area <br /> 24 (excluding projects carried out on the National Highway 3/stem)shall be <br /> 25 selected for implementation from the approved TPby the metropolitan <br /> 26 planning organization designated for the area in consultation with the State and <br /> 27 any affected public transportation operator;1 = Comment[BE23]:Added reference tospecific <br /> 28 language for selection of TIP projects in <br /> Transportation Management Areas. <br /> 29 g. Fbview and approval of planning proceduresfor air quality conformity and <br /> 30 review and approval of air quality conformity determination for projects, <br /> 31 programs,and plans;I Comment[BE24]':Added <br /> 32 <br /> 33 h. Faview and approval of a(bngestion Management Prooess; Comment[BE25]':Added <br /> 34 <br /> 35 i. Review and approval of the distribution and oversight of federal fundsdesignated <br /> 36 for theJDCHCMPOI under the provisionsof MAP-21 and any other subsequent Comment[BE26]' Changed from"Durham <br /> 37 Transportation Authorizations; Urbanized Area"in response to NCDOT comment <br /> 38 Comment[BE27]:Added <br /> 39 j. Feview and approval of a policy for public involvement for the DCHCMPO; Comment[BE28]:Added <br /> 40 <br /> 41 k. Review and approval of an agreement between the MPO,the State,and public <br /> 42 transportation operators serving the Metropolitan Planning Areathat defines <br /> 43 mutual responsibilitiesfor carrying out the metropolitan planningprocessin <br /> 44 accordance with 23 CF R 450.314; = comment[BE2s]!:Added <br /> 5 <br />