Orange County NC Website
27 <br /> 1 Support Components — shades, house lighting control, timers and clocks <br /> 2 Overflow Capabilities — infrastructure for large crowds <br /> 3 <br /> 4 Sound Reinforcement Plan <br /> 5 Speakers mounted in ceilings and bulkheads <br /> 6 Sound-absorbing panels will provide good room acoustics for speech <br /> 7 Microphones identical to what you are used to <br /> 8 Multiple zones for proper mix-minus operation <br /> 9 <br /> 10 Flat Screen Monitor Plan <br /> 11 60" Diagonal Monitor built into the presenter's podium for use by the Commission <br /> 12 80" Diagonal Monitors located high wall for public and staff use <br /> 13 60" Diagonal Monitors located on ceiling bulkheads for public use <br /> 14 Infrastructure provided for overflow conditions <br /> 15 <br /> 16 Podium Plan <br /> 17 Built-in 60" Diagonal Flat Screen Monitor <br /> 18 Complete presentation capabilities <br /> 19 HC accessible <br /> 20 <br /> 21 Camera Plan <br /> 22 Mounted to walls or pilasters <br /> 23 8-9 feet above floor <br /> 24 360-degree coverage <br /> 25 <br /> 26 TV Production Lighting Plan <br /> 27 2 by 2 Elliptical Lighting Fixtures provide front and back lighting of people <br /> 28 1 by 2 Wall Washers provide even lighting of background <br /> 29 Similar fixtures seen at former Wake County Commission Chambers <br /> 30 <br /> 31 Window Shading Plan <br /> 32 Motorized Shades on all windows in Meeting Room will be 5% open weave which allows <br /> 33 some light in but does not affect TV production capabilities <br /> 34 Manual Black-out Shades on windows in TV Production Room <br /> 35 Motorized Shades will be integrated into Crestron Touch Pad <br /> 36 <br /> 37 Support Components <br /> 38 Crestron Touch Panel Control can be installed on any smartphone, Ipad, laptop or flat <br /> 39 screen monitor <br /> 40 One permanent touch panel located near the main entry <br /> 41 A Digital Clock and Timer will be located for convenient use by the Commission <br /> 42 <br /> 43 TV Production Plan <br /> 44 Built-in counter and component racks for TV production <br /> 45 Coordination with existing streaming system <br /> 46 Separate air conditioning unit for this room <br /> 47 <br /> 48 David Taylor reviewed the following slide, as well as a series of images depicting the <br /> 49 layout of the room: <br /> 50 <br />