Browse
Search
Agenda - 01-23-2014 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 01-23-2014 - Regular Mtg.
>
Agenda - 01-23-2014 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2014 3:38:41 PM
Creation date
1/24/2014 2:15:47 PM
Metadata
Fields
Template:
BOCC
Date
1/23/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 01-23-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br /> 1 This project will be submitted as a reprioritized highway project to be considered for <br /> 2 inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 <br /> 3 STIP. <br /> 4 <br /> 5 7 Orange Grove Road Extension: Extend Orange Grove Road (SR 1006) from the east <br /> 6 side of South Churton Street (SR 1009) to U.S. 70 Business. <br /> 7 <br /> 8 This project will be submitted as a reprioritized highway project to be considered for <br /> 9 inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 <br /> 10 STIP. <br /> 11 <br /> 12 8 NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north <br /> 13 of NC 57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. <br /> 14 <br /> 15 This project will be submitted as a reprioritized highway project to be considered for <br /> 16 inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 <br /> 17 STIP. <br /> 18 <br /> 19 9 Park-and-Ride Improvements in Hillsborough (Conceptual): Implement park-and-ride <br /> 20 improvements in Hillsborough for cross-county, fixed-route service between Mebane <br /> 21 and Durham. <br /> 22 <br /> 23 This project will be submitted as a new transit project to the DCHC MPO for <br /> 24 consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as <br /> 25 the 2016-2022 STIP. The project's official submission must be made by Triangle <br /> 26 Transit. <br /> 27 <br /> 28 10 Hillsborough Train Station: Construct a train station in Hillsborough and implement <br /> 29 AMTRAK <br /> 30 service. <br /> 31 <br /> 32 This project will be submitted as a new transit/rail project by Triangle Transit for <br /> 33 consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as <br /> 34 the 2016-2022 STIP. <br /> 35 <br /> 36 11 Eno Mountain Road/Mayo Street at Orange Grove Road: Realign the intersection of Eno <br /> 37 Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR <br /> 38 1006) and make safety improvements. <br /> 39 <br /> 40 This project will be submitted as a reprioritized highway project for consideration of <br /> 41 inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 <br /> 42 STIP. <br /> 43 <br /> 44 12 Homestead Road Bike Lanes and Sidewalks: Improve Homestead Road (SR 1777) from <br /> 45 Old NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of <br /> 46 the corridor where they do not exist. <br /> 47 <br /> 48 This project will be submitted as a reprioritized highway project for consideration of <br /> 49 inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 <br /> 50 STIP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.