Browse
Search
Agenda - 01-23-2014 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 01-23-2014 - Regular Mtg.
>
Agenda - 01-23-2014 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2014 3:38:41 PM
Creation date
1/24/2014 2:15:47 PM
Metadata
Fields
Template:
BOCC
Date
1/23/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 01-23-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> 1 Orange County: <br /> 2 12" water line to site $375,000+ <br /> 3 10" sewer line to site $200,000+ <br /> 4 Service road extension $100,000+ <br /> 5 (Design, engineering &permitting for Ben Wilson service road) <br /> 6 PSNC Energy: <br /> 7 4" natural gas line to the site, paid by PSNC Energy. <br /> 8 Duke Energy: <br /> 9 Deliver electrical power & install transformers at the site, paid by Duke Energy. <br /> 10 <br /> 11 Access Road Extension <br /> 12 N. C. Department of Transportation: <br /> 13 • 2,500-ft road access construction. $500,000 <br /> 14 (extension of the existing Ben Wilson service road parallel along the highway to <br /> 15 Morinaga's site). <br /> 16 • Paid 100% by the N. C. Department of Transportation. <br /> 17 • Design & construction time is approximately 12 months. <br /> 18 • Road improvement improves the likelihood that nearby Mattress Factory Road may one <br /> 19 day be upgraded to become a full interchange. <br /> 20 <br /> 21 Craig Benedict, referring to the Access Road Extension slide, said the Department of <br /> 22 Transportation (DOT) will be building the road. He said Orange County staff will provide <br /> 23 environmental and design plans, and DOT will take it from there. <br /> 24 He said the majority of the infrastructure will be permitted in the spring of 2014 and will <br /> 25 be completed by the end of next year to meet the needs of Morinaga's planned opening in July <br /> 26 2015. <br /> 27 <br /> 28 Michael Talbert presented the following portion of the PowerPoint presentation: <br /> 29 <br /> 30 Orange County Incentive <br /> 31 Performance-Based Incentive is Calculated as Follows: <br /> 32 Inducement Grant is calculated at 75% of the estimated county taxable value of the <br /> 33 Company's investment, for up to 5 years. <br /> 34 $34 million investment = $218,790 annual grant <br /> 35 x 5 years = $1,093,950 total grant. <br /> 36 $48 million investment = $308,000 annual grant <br /> 37 x 5 years = $1,545,000 maximum total grant. <br /> 38 "Claw-back" provision is included in the Inducement Grant to require verification that the <br /> 39 Company reaches annual investment &jobs creation targets, before the County <br /> 40 incentive is paid. <br /> 41 Company will be required to provide health insurance for employees. <br /> 42 <br /> 43 City of Mebane Incentive <br /> 44 City of Mebane: <br /> 45 Mebane City Council approved a "performance-based" local incentive package, calculated as <br /> 46 1.5 % of the Company's actual investment, following a public hearing on October 7, 2013. <br /> 47 <br /> 48 $34 million investment @ 1.5 % _ $102,000 annual grant x 5 years = $510,000 total grant. <br /> 49 <br />