Browse
Search
2014-122 AMS - Lomax Construction Company Inc for Whitted Second Floor A Bldg Meeting Room Upfit and site work $880,400
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-122 AMS - Lomax Construction Company Inc for Whitted Second Floor A Bldg Meeting Room Upfit and site work $880,400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 1:56:40 PM
Creation date
1/23/2014 3:17:03 PM
Metadata
Fields
Template:
BOCC
Date
12/10/2013
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
7d - Mgr. signed
Amount
$880,400.00
Document Relationships
Agenda - 12-10-2013 - 7d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 12-10-2013 - Regular Mtg.
R 2014-122 AMS-Lomax Construction Company Inc for Whitted Second Floor A Bldg Meeting Room Upfit and site work
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. The Contractor shall supervise and direct the Work efficiently and with the Contractor's best <br /> skill and attention. Except as specifically set forth in the Contract Documents the Contractor <br /> shall be solely responsible for the means, methods, techniques, sequences and procedures of <br /> construction, and for safety precautions and programs in connection with the Work. The <br /> Contractor shall be responsible to see that the finished Work complies accurately with the <br /> Contract Documents. <br /> h. The Contractor shall appoint a competent Project Manager with general authority to manage <br /> the Project for the Contractor. The Contractor shall also keep on the Project at all times during <br /> the Work of the Contractor a competent Resident Superintendent and necessary assistants who <br /> shall not be replaced without prior written approval by the Designer or by the Owner if a <br /> Designer is not retained for the Project. <br /> i. If,in the opinion of the Designer, any Subcontractor on the Project is incompetent or otherwise <br /> unsatisfactory, such Subcontractor shall be replaced by the Contractor with no increase in the <br /> Contract Price if and when directed by the Designer. <br /> j. The Contractor shall attend all progress conferences and all other meetings or conferences. <br /> The Contractor shall be represented at these progress conferences by a representative having <br /> the authority of the Project Manager and by such other representatives as the Designer may <br /> direct. <br /> k. Costs and expenses of providing samples for and assistance in any testing shall be borne by the <br /> Contractor. Any Work in which untested materials are used without approval or written <br /> permission of the Owner and/or Designer shall be removed and replaced at Contractor's <br /> expense. <br /> 5. PAYMENT&TAXES <br /> a. The Owner hereby agrees to pay to the Contractor for the faithful performance of this <br /> Agreement, and the Contractor hereby agrees to perform all of the Work for a sum not-to- <br /> exceed Eight Hundred Eighty Thousand Four Hundred Dollars($880,400). Not later than the <br /> fifth (5th) day of each calendar month the Contractor shall submit to the Owner's <br /> Representative, generally the Designer if a Designer is retained on the Work, a Request for <br /> Payment for work done during the previous calendar month. <br /> (i) The Request for Payment shall be in form of a standardized invoice or AIA Document <br /> G702-703 appropriately addressed to Owner's Representative at Orange County, <br /> Attention Jeff Thompson, PO Box 8181, Hillsborough NC 27278 and shall show <br /> substantially the value of work done during the previous calendar month. <br /> (ii) The amount due for payment shall be ninety-five percent (95%) of the value of work <br /> completed since the last Request for Payment and this amount shall be paid by the <br /> Owner on or before the last business day of the month. Owner shall retain five percent <br /> (5%)(the"Retainage"). <br /> (1) Upon Owner's Representative's certification that fifty percent (50%) of the <br /> Work has been satisfactorily completed Retainage shall be reduced to two and <br /> one half percent(2%2%). <br /> Revised 9/13 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.