Browse
Search
2014-122 AMS - Lomax Construction Company Inc for Whitted Second Floor A Bldg Meeting Room Upfit and site work $880,400
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-122 AMS - Lomax Construction Company Inc for Whitted Second Floor A Bldg Meeting Room Upfit and site work $880,400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 1:56:40 PM
Creation date
1/23/2014 3:17:03 PM
Metadata
Fields
Template:
BOCC
Date
12/10/2013
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
7d - Mgr. signed
Amount
$880,400.00
Document Relationships
Agenda - 12-10-2013 - 7d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 12-10-2013 - Regular Mtg.
R 2014-122 AMS-Lomax Construction Company Inc for Whitted Second Floor A Bldg Meeting Room Upfit and site work
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1sT FLOOR RENOVATION OF WHITTED BUILDING <br /> HILLSBOROUGH,NORTH CAROLINA <br /> 221316 Drain,Waste and Vent Piping 221316-1 thru 4 <br /> 221319 Sanitary Waste Piping Specialties 221319-1 thru 4 <br /> 224000 Plumbing Fixtures 224000-1 thru 5 <br /> 224700 Water Coolers 224700-1 thru 2 <br /> DIVISION 23 —HEATING VENTILATING AND AIR CONDITIONING <br /> 230050 COMMON WORK RESULTS FOR HVAC 17 <br /> 230100 PENETRATION FIRESTOPPING 2 <br /> 230513 COMMON MOTOR REQUIREMENTS FOR HVAC 2 <br /> EQUIPMENT <br /> 230529 HANGERS AND SUPPORTS F OR HVAC PIPING AND 5 <br /> EQUIPMENT <br /> 230548 VIBRATION AND SEISMIC CONTROLS FOR HVAC 2 <br /> 230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 3 <br /> 230593 TESTING,ADJUSTING,AND BALANCING FOR HVAC 12 <br /> 230700 HVAC INSULATION 6 <br /> 230900 INSTRUMENTATION AND CONTROLS 3 <br /> 233113 METAL DUCTS 6 <br /> 233300 AIR DUCT ACCESSORIES 4 <br /> 233416 CENTRIFUGAL HVAC FANS 5 <br /> 233423 HVAC POWER VENTILATORS 5 <br /> 233713 DIFFUSERS,REGISTERS,AND GRILLES 2 <br /> DIVISION 26—ELECTRICAL <br /> 260500 Common Work Results for Plumbing 260500-1 thru12 <br /> 260100 Firestopping Penetration 260100-1 thru 2 <br /> 260519 Low-Voltage Electrical Power Conductors and Cables 260519-1 thru 2 <br /> 260526 Grounding and Bonding for Electrical Systems 260526-1 thru 3 <br /> 260529 Hangers and Supports for Electrical Systems 260529-1 thru 3 <br /> 260533 Raceway and Boxes for Electrical Systems 260533-1 thru 6 <br /> 260548 Vibration and Seismic Controls For Electrical Systems 260548-1 thru 2 <br /> 260553 Identification for Electrical Systems 260553-1 thru 3 <br /> 260923 Lighting Control Devices 260923-1 thru 4 <br /> 262200 Low-Voltage Transformers 262200-1 thru 3 <br /> 262416 Panelboards 262416-1 thru 4 <br /> 262726 Wiring Devices 262726-1 thru 4 <br /> 262816 Enclosed Switches and Circuit Breakers 262816-1 thru 2 <br /> 265100 Interior Lighting 265100-1 thru 5 <br /> DIVISION 28—LOW-VOLTAGE ELECTRICAL <br /> 283111 Digital,Addressable Fire-Alarm System 283111-1 thru 7 <br /> TABLE OF CONTENTS TOC -iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.