Browse
Search
2014-122 AMS - Lomax Construction Company Inc for Whitted Second Floor A Bldg Meeting Room Upfit and site work $880,400
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-122 AMS - Lomax Construction Company Inc for Whitted Second Floor A Bldg Meeting Room Upfit and site work $880,400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 1:56:40 PM
Creation date
1/23/2014 3:17:03 PM
Metadata
Fields
Template:
BOCC
Date
12/10/2013
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
7d - Mgr. signed
Amount
$880,400.00
Document Relationships
Agenda - 12-10-2013 - 7d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 12-10-2013 - Regular Mtg.
R 2014-122 AMS-Lomax Construction Company Inc for Whitted Second Floor A Bldg Meeting Room Upfit and site work
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a0111- /;?Xl <br /> )q AS <br /> [Departmental Use Only] <br /> TITLE Whitted Meeting Room <br /> FY 2013-14 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT(hereinafter called"Agreement"),made as of the 15th day of <br /> January, 2014, by and between Lomax Construction, Inc., (hereinafter called the "Contractor"), and Orange <br /> County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named,agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and/or field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement with incorporated General Conditions. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and/or field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Corley, Redfoot Architects, according to attached Exhibit <br /> A, project specification manual table of contents, entitled "Table of Contents" and Exhibit B <br /> entitled "List of Drawings" (Sheet set G0.0 through E3.2 and addenda dated 11/26/13, with <br /> addenda dated 12/9/13, 12/12/13,and 12/18/13) <br /> b. Written specifications prepared by the Designer. <br /> c. Bid #1218 proposal dated December 19, 2013, summarized by the highlighted Contractor bid <br /> amounts located in Exhibit C entitled 'Bid Tabulation for 1" Floor Renovation of Richard E. <br /> Whitted Building, Hillsborough, NC", which includes the base bid amount of $837,400, <br /> Alternate G-1 of$40,500, and Alternate G-2 of$2,500 which fully describes the work to be <br /> Revised 9/13 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.