Orange County NC Website
a0111- /;?Xl <br /> )q AS <br /> [Departmental Use Only] <br /> TITLE Whitted Meeting Room <br /> FY 2013-14 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT(hereinafter called"Agreement"),made as of the 15th day of <br /> January, 2014, by and between Lomax Construction, Inc., (hereinafter called the "Contractor"), and Orange <br /> County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named,agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and/or field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement with incorporated General Conditions. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and/or field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Corley, Redfoot Architects, according to attached Exhibit <br /> A, project specification manual table of contents, entitled "Table of Contents" and Exhibit B <br /> entitled "List of Drawings" (Sheet set G0.0 through E3.2 and addenda dated 11/26/13, with <br /> addenda dated 12/9/13, 12/12/13,and 12/18/13) <br /> b. Written specifications prepared by the Designer. <br /> c. Bid #1218 proposal dated December 19, 2013, summarized by the highlighted Contractor bid <br /> amounts located in Exhibit C entitled 'Bid Tabulation for 1" Floor Renovation of Richard E. <br /> Whitted Building, Hillsborough, NC", which includes the base bid amount of $837,400, <br /> Alternate G-1 of$40,500, and Alternate G-2 of$2,500 which fully describes the work to be <br /> Revised 9/13 1 <br />