Browse
Search
RES-2013-080 NO ACTION - Resolution Endorsing Projects for the DCCHC MPO Transportation Improvement Program
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2010-2019
>
2013
>
RES-2013-080 NO ACTION - Resolution Endorsing Projects for the DCCHC MPO Transportation Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 3:27:59 PM
Creation date
1/23/2014 9:27:42 AM
Metadata
Fields
Template:
BOCC
Date
10/15/2013
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
7c
Document Relationships
Agenda - 10-15-2013 - 7c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 10-15-2013 - Regular Mtg.
Minutes 10-15-2013
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 5: Resolution Endorsing Projects for the DCHC MPO Transportation 17 <br /> Improvement Program <br /> This project will be submitted as a reprioritized highway project for consideration of inclusion in <br /> the DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 11 Homestead Road Bike Lanes and Sidewalks: Improve Homestead Road (SR 1777) from Old <br /> NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the corridor <br /> where they do not exist. <br /> This project will be submitted as a reprioritized highway project for consideration of inclusion in <br /> the DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 12 Eubanks Road Bike Lanes: Construct bicycle lanes on Eubanks Road (SR 1727) from Old NC <br /> 86 (SR 1009) to NC 86. <br /> This project will be submitted as a reprioritized highway project for consideration of inclusion in <br /> the DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 13 Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union <br /> Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4)-foot <br /> paved shoulders. <br /> This project will be submitted as a reprioritized highway project for consideration of inclusion in <br /> the DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 14 Orange Grove Road/1-40 Pedestrian Bridge: Construct a pedestrian bridge over 1-40 alongside <br /> Orange Grove Road (SR 1006) and construct a sidewalk along the north side of Orange Grove <br /> Road (SR 1006) from the pedestrian bridge to Timbers Drive. <br /> This project will be submitted as a new pedestrian project for consideration of inclusion in the <br /> DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> Upon motion of Commissioner , seconded by Commissioner , <br /> the foregoing resolution was adopted this theme day of October, 2013. <br /> I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO <br /> HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a <br /> meeting held on October 15, 2013, as relates in any way to the adoption of the foregoing and that said <br /> proceedings are recorded in the minutes of said Board. <br /> WITNESS my hand and the seal of said County, this day of , 2013. <br /> Clerk to the Board of Commissioners <br />
The URL can be used to link to this page
Your browser does not support the video tag.