Orange County NC Website
Attachment 5: Resolution Endorsing Projects for the DCHC MPO Transportation 16 <br /> Improvement Program <br /> 2 U.S. 70 East/1-85 Connector: Modify the 1-85 Connector (SR 1239) interchange at U.S. 70 to <br /> provide access from all directions. <br /> This project will be submitted as a reprioritized highway project to be considered for inclusion <br /> in the DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 3 Orange Grove Road Extension: Extend Orange Grove Road (SR 1006) from the east side of <br /> South Churton Street (SR 1009) to U.S. 70 Business. <br /> This project will be submitted as a reprioritized highway project to be considered for inclusion <br /> in the DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 4 NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC <br /> 57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. <br /> This project will be submitted as a reprioritized highway project to be considered for inclusion <br /> in the DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 5 NC 54 Widening: Widen NC 54 from Neville Road (SR 1945) to Old Fayetteville Road (SR <br /> 1107/1937) from a two (2)-lane undivided thoroughfare to a four (4)-lane divided boulevard <br /> type thoroughfare. <br /> This project will be submitted as a new highway project to be considered for inclusion in the <br /> DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 6 1-40 Widening: Widen 1-40 from four (4) lanes to six (6) lanes from the 1-40/1-85 interchange to <br /> the Durham County line. <br /> This project will be submitted as a reprioritized highway project for consideration of inclusion in <br /> the DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 7 1-85 Widening: Widen 1-85 from four (4) lanes to six (6) lanes from the 1-40/1-85 interchange to <br /> the Durham County line. <br /> This project will be submitted as a reprioritized highway project for consideration of inclusion in <br /> the DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 8 Hillsborough Train Station: Construct a train station in Hillsborough and implement AMTRAK <br /> service. <br /> This project will be submitted as a new transit/rail project by Triangle Transit for consideration <br /> of inclusion in the DCHC MPO MTIP as well as the 2016-2022 STIP. <br /> 9 Buckhorn Economic Development District (EDD) Park-and-Ride: Construct a park-and-ride <br /> facility to be located in the I-85/Buckhorn Road EDD. <br /> This project will be submitted as a new transit project by Triangle Transit or the Piedmont <br /> Authority for Regional Transportation (PART) for consideration of inclusion in the DCHC MPO <br /> MTIP as well as the 2016-2022 STIP. <br /> 10 Eno Mountain Road/Mayo Street at Orange Grove Road: Realign the intersection of Eno <br /> Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) <br /> and make safety improvements. <br />