Browse
Search
2014-116 Planning - J. F. Wilkerson Contracting Co., Inc. for Buckhorn Mebane Utilities Phase 2 Change Order #2
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-116 Planning - J. F. Wilkerson Contracting Co., Inc. for Buckhorn Mebane Utilities Phase 2 Change Order #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 3:10:06 PM
Creation date
1/17/2014 11:04:09 AM
Metadata
Fields
Template:
BOCC
Date
1/15/2014
Meeting Type
Work Session
Document Type
Contract
Agenda Item
CO - Manager signed
Amount
$2,242.50
Document Relationships
R 2014-116 Planning - J F Wilkerson Contracting Co for Buckhorn Mebane Utilities Phase 2 Change Order #2
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT <br /> Craig N. Benedict, AICP, Director <br /> Administration ®`°®4 <br /> (919) 245-2575 131 W. Margaret Ln. <br /> (919) 644-3002 (FAX) 52 P. O. Box 8181 <br /> www.co.orange.nc.us Hillsborough, NC 27278 <br /> A&MARW Ow <br /> 1 <br /> MEMORANDUM <br /> To: Michael Talbert, Interim County Manager <br /> Through: Craig Benedict, Planning Director n <br /> From: Kevin Lindley, PE, Staff Engineer <br /> Date: January 6, 2014 <br /> RE: Buckhorn Mebane Phase 2 Utility Project Change Order#2 <br /> This change order combines two change order requests submitted by the <br /> Contractor to the County's engineering consultant in late August and mid- <br /> September. The first of these two requests asked for 8 extra days due to inclement <br /> weather, as shown on the supporting documentation. The second request was for <br /> extra cost required to resurvey/layout the sewer line across the Rohl property north <br /> of West Ten Road. This was a County-initiated shift in sewer alignment made <br /> necessary based on the results of the Cultural and Archaelogical Survey performed <br /> pursuant to County Policy. This cost can be covered by the existing project <br /> budget. It will be paid out of a portion of the budget set aside as an easement <br /> resolution contingency. <br /> The costs of this change order have been summarized below, along with the <br /> summary for Change Order#1. Going forward, new change orders can be added <br /> to the summary so that all the change order information will be available in one <br /> document. <br /> Original Contract Price: $4,016,545.74 <br /> - Original rock contingency for water line: $ 67,500.00 (included) <br /> CO#1 $ 15,328.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.