Browse
Search
2014-100 AMS - Stewart-Cooper-Newell Architects, Inc. for Emergency Services Station Prototype Design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-100 AMS - Stewart-Cooper-Newell Architects, Inc. for Emergency Services Station Prototype Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 9:20:58 AM
Creation date
1/13/2014 1:03:38 PM
Metadata
Fields
Template:
Contract
Date
1/6/2014
Contract Starting Date
1/6/2014
Contract Document Type
Agreement - Consulting
Amount
$32,800.00
Document Relationships
R 2014-100 AMS - Stewart-Cooper-Newell Architects Inc for Emergency Services Station Prototype Design
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� n <br /> s <br /> Programming Phase <br /> An on-site meeting with EMS and County representatives to discuss all spaces(interior and <br /> exterior)needed for the appropriate prototype facility needs. <br /> SCNA will submit a draft written program document that identifies all spaces,their sizes <br /> and descriptions,total facility size,and projected construction cost to EMS and County <br /> staff for review,comment and approval. <br /> SCNA will revise,finalize and submit the written program document. <br /> Schematic Design Phase <br /> Based upon the approved written program and construction cost estimate, SCNA will <br /> prepare concept floor plans of both prototype facilities. <br /> An on-site meeting with EMS and County representatives to present the concept floor plans <br /> and gather input for further development. <br /> SCNA will incorporate the ideas and suggestions developed from the meeting,and will also <br /> prepare concept exterior elevation sketches. <br /> An on-site meeting with EMS and County representatives,along with the Public(l" Public <br /> Meeting)to present the further developed floor plans and concept exterior elevations(90% <br /> Schematic Design documents). <br /> SCNA will revise and finalize the Schematic Design documents. <br /> Written Report Phase <br /> SCNA will prepare the draft summary booklet to include the information as described <br /> above. <br /> An on-site meeting with EMS and County representatives,along with the Board(2nd Public <br /> Meeting)to present the draft summary booklet and to receive further input. <br /> SCNA will finalize the written report. <br /> Report and Presentation Phase <br /> SCNA will present the final report and data to the Board(P Public Meeting). <br /> SCNA will make any final revisions requested by the Hoard to the report. <br /> SCNA will submit the final document to the County. <br /> ARCHITECTURE <br /> PLANNING 2 <br /> IN-1 ERIORS <br /> 7,ONSULTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.