Browse
Search
2014-100 AMS - Stewart-Cooper-Newell Architects, Inc. for Emergency Services Station Prototype Design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-100 AMS - Stewart-Cooper-Newell Architects, Inc. for Emergency Services Station Prototype Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 9:20:58 AM
Creation date
1/13/2014 1:03:38 PM
Metadata
Fields
Template:
Contract
Date
1/6/2014
Contract Starting Date
1/6/2014
Contract Document Type
Agreement - Consulting
Amount
$32,800.00
Document Relationships
R 2014-100 AMS - Stewart-Cooper-Newell Architects Inc for Emergency Services Station Prototype Design
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CURRENT ON-GOING PROJECTS <br /> Disclosure Statement: Section 4 <br /> Current Projects Start Date Expected Completion Date Expected Project Cost <br /> Ken Newell,AIA LEED AP: <br /> Blacksburg, VA EMS 4/2013 Fall 2014 $4.5 Million <br /> Danville, VA <br /> Fire Dept. + EOC 4/2013 Summer 2014 $ 7 Million <br /> Johns Island, SC <br /> Fire HQ + Station No. 3 1/2013 Summer 2014 $ 3 Million <br /> Hilton Head Island, SC <br /> Fire Substaion No. 6 7/2013 Summer 2014 $ 2.5 Million <br /> Raleigh, NC <br /> Bay Leaf VFD 8/2012 Fall 2013 $ 3.1 Million <br /> Faquay-Varina, NC <br /> Fire Station No.2 - Study 2/2013 Summer 2013 $ 1.1 Million <br /> Tallahasse, FL <br /> Fire Dept Substation 8/2012 Summer 2014 $ 2.5 Million <br /> Mt. Pleasant, SC <br /> Fire Station No. 6 4/2013 Fall 2014 $ 1.5 Million <br /> Current Projects Start Date Expected Completion Date Expected Project Cost <br /> James Stumbo,AIA LEED AP BD+C, NFPA: <br /> Holly Springs, NC <br /> Police Dept. HQ 6/2013 Winter 2014 $ 5.5 Million <br /> Brunswick Co., NC <br /> 911 / EOC 4/2013 Winter 2014 $ 2.3 Million <br /> Ft. Smith,AR <br /> Training Center 2/2013 Spring 2014 Consultant <br /> Buncombe Co., NC Training <br /> Center Classroom Bldg. 1/2012 Fall 2014 $ 7 Million <br /> Jacksonville, NC <br /> Fire Station No. 2 3/2012 Spring 2014 $ 2.7 Million <br /> Current Schedule Capacity of Key Personnel <br /> ItJ% Zfl°d 34MG 40% 0% 6U5d' 7U% <br /> Ken NeweK,AIA AvailableMmo- <br /> Prft%*&in CtIf7W sus s.. .»s•es <br /> IhnStumbo,ALA AvaiWb 3lme .•.s. <br /> j'""aC V1 ft tyCcntraP <br /> Stewart erlewell <br /> rc, <br />
The URL can be used to link to this page
Your browser does not support the video tag.