Browse
Search
2014-100 AMS - Stewart-Cooper-Newell Architects, Inc. for Emergency Services Station Prototype Design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-100 AMS - Stewart-Cooper-Newell Architects, Inc. for Emergency Services Station Prototype Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 9:20:58 AM
Creation date
1/13/2014 1:03:38 PM
Metadata
Fields
Template:
Contract
Date
1/6/2014
Contract Starting Date
1/6/2014
Contract Document Type
Agreement - Consulting
Amount
$32,800.00
Document Relationships
R 2014-100 AMS - Stewart-Cooper-Newell Architects Inc for Emergency Services Station Prototype Design
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT UNDERSTANDING <br /> Understanding the Project Scope and <br /> Approach to the Orange County Emergency Services Station Prototype Design <br /> Our Team will work side-by-side with Orange County During Each and Every Step of the <br /> Design Process. <br /> When we are working with the County, our design approach will stress three major points: <br /> teamwork, quality and reliably meeting budgets and schedules. To that end, we believe <br /> that it is the design team's role to successfully accomplish the following: <br /> • Understand the County's expectations and satisfy their programmatic requirements <br /> • Keep the total project in-budget and on-schedule <br /> • Provide for effective coordination and communication <br /> • Engage in timely documentation to disseminate client decisions <br /> • Deliver three high-quality, compelling design solution that meets current <br /> needs and anticipates future growth <br /> This diagram illustrates our team's typical approach to Programming and Schematic Design: <br /> 3 4 5 <br /> Profile Revievv <br /> Services Analyze N—Trands <br /> and space In Govt. <br /> perabons Utilization operations <br /> Assessing Services and Operations Oparatlons <br /> (Phase 1) 13 74 <br /> News Evaluate Option DevelopCapiw <br /> Plan and pnonties improvement Ran <br /> 7 9 <br /> Refine Project -Operational Develop Strategy <br /> Goalsand FZ.e. Changes i <br /> Objectives Workshop Fuharc Space Space -Renovations Phasing <br /> Personnel standards Needs -Expansion -Implementation <br /> -NmConsouction xr schedule <br /> -Reloi:atioriol <br /> Assessing Staffing&Space Needs Functions <br /> (Phase 1) Cost�tima7es <br /> 10 11 12 <br /> Building site , Parking <br /> :ImetoryN Assessnert Trafic <br /> Evahaton Impact <br /> Assessing Existing Facilities&Available Properties <br /> Once we have validated the programming, we will start the Schematic Design Phase, <br /> including: <br /> -Present three concepts that incorporate the County's Comprehensive Plan, including a stand- <br /> alone station, and addition for existing fire stations and a co-located station in a non-emergency <br /> services facility. <br /> Communicate the expected cost for each design, and best suited method for delivery. <br /> As the preferred design is considered and refined, we will produce presentations materials <br /> for presentation to the Committee, as well as selected boards and agencies. <br /> - Cost Estimating and Project Scheduling will be Communicated to the County during the <br /> entire process. <br /> - Once Programming and Schematic Designs are complete, we hope to be asked to continue <br /> working with the County until the new Station is completed. <br /> ISMSte , <br /> ,v,art- er,Newell <br /> rc, J ects <br />
The URL can be used to link to this page
Your browser does not support the video tag.