Browse
Search
2014-100 AMS - Stewart-Cooper-Newell Architects, Inc. for Emergency Services Station Prototype Design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-100 AMS - Stewart-Cooper-Newell Architects, Inc. for Emergency Services Station Prototype Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 9:20:58 AM
Creation date
1/13/2014 1:03:38 PM
Metadata
Fields
Template:
Contract
Date
1/6/2014
Contract Starting Date
1/6/2014
Contract Document Type
Agreement - Consulting
Amount
$32,800.00
Document Relationships
R 2014-100 AMS - Stewart-Cooper-Newell Architects Inc for Emergency Services Station Prototype Design
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRE + EMS HEADQUARTERS <br /> Community of Bahama, North Carolina <br /> Co-Located <br /> Oft <br /> r <br /> sue' <br /> ,, rf <br /> This station is located in northern <br /> PROJECT OWNER: �, � Dugham County, in a very restricted <br /> Len Needham watershed district, which requires <br /> Fire Chief a lot size of over twenty acres. The <br /> (919) 477-1561 �� '� Li N al",— station accommodates eight fire <br /> needham @email <br /> unc.edu apparatus, eight full-time fire fighters <br /> and a training/social facility that can <br /> SCNA ROLE: R accommodate over seventy people. <br /> y <br /> Architect of Record The station also utilizes a split-level <br /> design that reduces the overall height <br /> PROJECT SCOPE: of the station, while saving money <br /> Programming + ' � by limiting the required site grading. <br /> Concept Due to the limited road frontage, the <br /> Schematic Design station was designed with the drive- <br /> through apparatus bays at the rear <br /> SIZE: of the station. <br /> 14,187 SF <br /> DATES: <br /> Construction <br /> Completed <br /> February 2005 <br /> COST: : <br /> $1.5 Million <br /> fl stewt er �lewell <br />
The URL can be used to link to this page
Your browser does not support the video tag.