Browse
Search
2014-100 AMS - Stewart-Cooper-Newell Architects, Inc. for Emergency Services Station Prototype Design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-100 AMS - Stewart-Cooper-Newell Architects, Inc. for Emergency Services Station Prototype Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 9:20:58 AM
Creation date
1/13/2014 1:03:38 PM
Metadata
Fields
Template:
Contract
Date
1/6/2014
Contract Starting Date
1/6/2014
Contract Document Type
Agreement - Consulting
Amount
$32,800.00
Document Relationships
R 2014-100 AMS - Stewart-Cooper-Newell Architects Inc for Emergency Services Station Prototype Design
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRE + RESCUE / EMS HEADQUARTERS <br /> City of Washington, North Carolina <br /> Co-Located <br /> Mi s <br /> F= Fire/Rescue/EMS Station No. 2 for <br /> CONTACT: the City of Washington was the first <br /> Robbie Rose , <br /> Division Chief Capital Improvement project in a <br /> (252) 948-9402 series that was recommended by the <br /> rrose @washingtonnc. Public Safety Space Analysis Study <br /> gov performed by Stewart-Cooper-Newell <br /> ROLE: Architects. The city completed this <br /> Architect of Record project through funding from USDA <br /> Rural Development financing. <br /> SCOPE: <br /> Space Needs Study The Substation's design and location <br /> Site Planning allowed the Fire and EMS Departments <br /> Programming "' <br /> g g + to greatly improve their response times <br /> Concept to recently annexed areas of the City, <br /> Schematic Design and thereby helped them maintain their <br /> Construction Doc. <br /> Construction Admin. existing ISO classification. Due to its <br /> coastal location, this facility was also <br /> SIZE: designed to be hurricane resistant. <br /> 11,298 SF <br /> The three-bay facility contains six <br /> DATES: sleep rooms, a dayroom, a kitchen, an <br /> Construction Com- exercise area, a training / community <br /> pleted room, and administrative offices. <br /> February 2008 <br /> COST: <br /> $2.26 million <br /> � Ste "er- ewell <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.