Browse
Search
2014-101 Planning - J. F. Wilkerson Contracting Co., Inc. for Buckhorn Mebane Utilities Phase 2 Change Order #1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-101 Planning - J. F. Wilkerson Contracting Co., Inc. for Buckhorn Mebane Utilities Phase 2 Change Order #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 9:49:21 AM
Creation date
1/13/2014 12:39:28 PM
Metadata
Fields
Template:
Contract
Date
1/13/2014
Contract Starting Date
4/16/2013
Contract Ending Date
6/12/2014
Contract Document Type
Contract Amendment
Amount
$0.00
Document Relationships
R 2014-101 Planning - J F Wilkerson Contracting Co for Buckhorn Mebane Utilities Phase 2 Change Order #1
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J.F. Wilkerson Contracting Co., Inc. <br /> PO Box 183 <br /> Morrisville, NC 27560 <br /> CHANGE ORDER REQUEST <br /> Engineer: Hobbs Upchurch Associates <br /> Owner: Orange County <br /> Contractor: J.F. Wilkerson <br /> Job: Buckhorn—Mebane EDD Phase 2 <br /> Project Manager: Michael Coates <br /> Request number: 3 <br /> Date: August 7, 2013 <br /> Description of extra work: <br /> Wilkerson crew has encountered a 4 inch waterline (shown 2") at the bore pit <br /> area at Buckhorn Rd. <br /> The existing waterline is shown to be 18 inches above the new 16" DIP. <br /> However, the actual site condition is that the existing 4 inch PVC waterline is <br /> on the same grade as the new 16" waterline. Wilkerson crew has installed a <br /> by- pass system (in place 8/6/13) for the existing 4" line during construction. <br /> The existing 4" line will need to be lowered by the use of 4 - 45 degree bends <br /> with concrete blocking to accommodate the new 16" DIP line under <br /> construction. <br /> Request for compensation: <br /> Labor <br /> Boring crew: Foreman, welder, pipelayer, two laborers. <br /> 8 Hours @ $163 1,304 <br /> EquiRment <br /> Cat 330 Excavator Daily cost $540 540 <br /> Cat 420 Backhoe Daily cost$195 195 <br /> Rammax tamper Daily cost $105 105 <br /> Trucks, supplies Daily cost $120 120 <br /> Materials <br /> PVC 4" assume 2010 Joint @ $151f. 300 <br /> 45 degree bends 4@ $25 100 <br /> Concrete assume 2 cu. Yd 150 300 <br /> Total of all labor, equipment,and materials $2,964 <br /> 15% Overhead/profit allowed -444 <br /> Total Change Order this request $3,408 <br /> Request for additional Days: 1 day <br />
The URL can be used to link to this page
Your browser does not support the video tag.