Orange County NC Website
RKGIM <br /> R E E, P1t31 AND & McELRATH, INC. <br /> 4W NortH Haywood SUvat+P.0,Box 590 <br /> WaynesviDs,NOM carotlna 28 <br /> Waynesvyle 8284 - 1 s Tao Fms SCI-849.04 <br /> Fax 82$458.62M.EffmV <br /> DATE: December 12,2013 <br /> PROJECT: Coaanmunity Geodmrrnal System Phase II <br /> Orange County <br /> Hillabor+ough,NC <br /> CONTRACT FOR: Mechanical Construction <br /> CONTRACT DATE: June 19,2013 <br /> TO: Warren-Ray Mechanical Contractors,Inc. <br /> PO Box 818 <br /> Hillsborough,NC 27278 <br /> You are directed to make the following changes in this Contract: <br /> • hwi de 2301 tear feet of directional boring through rock encountered in than more under Margaret Lanz at the rate of$754mar <br /> foot,for a total change order ADD o£$17,250. <br /> The or al Contract Sum was $1,579,193 <br /> Net change by prevlom auk change orders $0 <br /> The Contract Sum pnor to this Change Order was $1,579,193 <br /> The Contract Sure will be INCREASED by this Change Order in the amount of $17,2 {} <br /> The new Contract Sum including this Change Order will be $1,596,443 <br /> The Contract Tme will be unchanged by this chauge order. <br /> ACC''EP'TF.D BY: <br /> CONTRACTOR.Warren-Hay Con ors, <br /> ate: 2 <br /> O1N'NMU orange Co C <br /> By: <br /> Date: <br /> DESIGNER: REECE,NOLAND&M LRATH,INC. <br /> .,.., <br /> Date: ► �"a� <br />