Browse
Search
2013-513 AMS - Solutions for Local Government Inc for Orange County Jail Capacity Assessment & Programming $26,400
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-513 AMS - Solutions for Local Government Inc for Orange County Jail Capacity Assessment & Programming $26,400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2014 3:25:24 PM
Creation date
1/2/2014 3:25:21 PM
Metadata
Fields
Template:
BOCC
Date
12/10/2013
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
7a
Document Relationships
Agenda - 12-10-2013 - 7a
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 12-10-2013 - Regular Mtg.
R 2013-513 AMS - Solutions for Local Government Inc for Orange County Jail Capacity Assessment & Programming $26,400
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES&WORK PLAN ORANGE COUNTY,North Carolina <br /> Jail Inmate Projections&Facility Program <br /> A final Site Plan Concept will then be developed from the preferred option chosen. This site <br /> plan concept will include a brief narrative description and accompanying site diagram(s) that <br /> illustrate: <br /> • The general boundaries and characteristics of the building site <br /> • Location of the proposed building(s)on the site <br /> • Access&egress to and from the site <br /> • Secure, public,and controlled points of access to/from the building(s) <br /> • Circulation to/from and on the site of public visitors, law enforcement personnel,and <br /> jail staff,and service providers <br /> • Designated staff and visitor/public parking areas <br /> PHASE 4.PROBABLE COSTS <br /> Oncet heF acility Program and Site Plan Concept have been completed a final pre-design <br /> estimate of probable construction and project related costs will be developed. The categories of <br /> costs addressed will include: <br /> • Design Development Costs <br /> • Construction Costs <br /> • Project Related Costs <br /> Design Development; the fees identified will include associated architectural and engineering <br /> design fees for the major work tasks commonly called for in complex projects such as a county <br /> jail.The work for which fees will be calculated will include site investigations and site design,the <br /> estimated cost of the various phases of design development, the bidding process, and <br /> construction administration. <br /> Construction; at this level of project development, a pre-design estimate of probable costs will <br /> be included for site development and new building construction. Estimated costs will be based <br /> on the costp er gross square foot of building /ors pace to be developed times the total gross <br /> square feet identified. The construction cost per square foot identified,a nd for that matter the <br /> percentage of cost rates identified for planning and design, will be based on both the <br /> consultant's data base of similar North Carolina projectsa s well as (for comparison) various <br /> national publications regarding cost indexing for these types of facilities. <br /> Project Related;these expenses will be provided as general estimates of various but commonly <br /> occurring project related costs not otherwise included in the design or construction cost <br /> categories. The figuresi ncluded are intended to give the County a general idea of what to <br /> expect and budget for with regards to reimbursable project expenses, materials testing, pre- <br /> construction site surveys, soils testing, required contingencies, and furnishings and equipment <br /> not otherwise provided by the contractor. <br /> PHASE S.DEVELOPMENT SCHEDULES <br /> Once work in the above referenced phases has been completed, suggested schedule(s) for <br /> development and the associated costs of development by phase, month, calendar quarter, etc. <br /> will be important to enable the County to prepare appropriate CIP and annual fiscal year <br /> budgets accordingly. <br /> Solutions for Local Government,Inc. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.