Orange County NC Website
Page 18 of 40 <br /> i. Department Technical Review. The Contractor agrees to permit the <br /> Department to review and approve the technical specifications and requirements to the extent <br /> the Department believes necessary to ensure proper Project administration. The Contractor <br /> agrees to submit the following to the Department for its review and approval prior to solicitation: <br /> (1) New/adapted specifications for equipment, supplies, apparatuses and <br /> new-type rolling stock. This requirement does not apply to equipment, supplies, or apparatuses <br /> with cost of less than $30,000; or to Minivans; Conversion and Lift Vans; Center Aisle Vans and <br /> Standard Vans; and Light Transit Vehicles (Cutaway-type Bus). <br /> (2) Drawings, designs, and/or description of work for construction, renovation, <br /> or facility improvement projects, including the purchase or construction of bus shelters. <br /> j. Department Pre-award Approval. The Contractor agrees to submit <br /> procurement documents to the Department for its review and approval prior to award of a <br /> contract/subcontract under this Agreement for any of the following: <br /> (1) All new-type rolling stock, excluding Minivans; Conversion and Lift <br /> Vans; Center Aisle Vans and Standard Vans; and Light Transit Vehicles (Cutaway-type Bus). <br /> (2) All construction projects equal to or greater than $30,000; <br /> (3) Any "brand name" product or sole source purchase equal to or greater <br /> than $2,500; <br /> (4) Any contract/subcontract to other than apparent lowest bidder equal to <br /> or greater than $2,500; <br /> (5) Any procurement equal to or greater than $90,000; <br /> (6) Any contract modification that would change the scope of a contract or <br /> increase the contract amount up to or over the formal (sealed) bid threshold of$90,000. <br /> k. Project Approval/Third Party Contract Approval. Except to the extent the <br /> Department determines otherwise in writing, the Contractor agrees that the Department's award <br /> of Federal and State assistance for the Project does not, by itself, constitute pre-approval of any <br /> non-competitive third party contract associated with the Project. <br /> I. Preference for Recycled Products. To the extent applicable, the Contractor <br /> agrees to comply with U.S. EPA regulations, "Comprehensive Procurement Guidelines for <br /> Products Containing Recovered Materials," 40 C.F.R. Part 247, which implements Section 6002 <br /> of the Resource Conservation and Recovery Act, as amended, 42 U.S.C. § 6962, and with <br /> subsequent Federal regulations that may be promulgated. Accordingly, the Contractor agrees <br /> to provide a competitive preference for products and services that conserve natural resources, <br /> protect the environment, and are energy efficient. <br /> M. Clean Air and Clean Water. The Contractor agrees to include in each third <br /> party contract and sub-agreement exceeding $100,000 adequate provisions to ensure that each <br /> Project participant will agree to report the use of facilities placed on or likely to be placed on the <br /> U.S. Environmental Protection Agency (U.S. EPA) "List of Violating Facilities," to not use any <br /> violating facilities, to report violations to the Department and the Regional U.S. EPA Office, and <br /> to comply with the inspection and other applicable requirements of: <br /> (1) Section 306 of the Clean Air Act, as amended, 42 U.S.C. § 7414, and <br /> other applicable provisions of the Clean Air Act, as amended, 42 U.S.C. §§ 7401 through <br /> 7671q; and <br /> (2) Section 508 of the Clean Water Act, as amended, 33 U.S.C. § 1368, <br /> and other applicable requirements of the Clean Water Act, as amended, 33 U.S.C. §§ 1251 <br /> through 1377. <br /> n. National Intelligent Transportation Systems Architecture and Standards. To <br /> the extent applicable, the Contractor agrees to conform to the National Intelligent Transportation <br /> Systems (ITS) Architecture and Standards as required by SAFETEA-LU § 5307(c), 23 U.S.C. § <br /> 512 note, and comply with FTA Notice, "FTA National ITS Architecture Policy on Transit <br /> Revised 02/20/13 <br />