Orange County NC Website
Mr. Jeff Thompson <br /> November 11, 2013 <br /> Page 5 <br /> Construction Field Representative II $ 75.00 <br /> Construction Field Representative III $ 80.00 <br /> Planner 1 $ 85.00 <br /> Planner II $ 95.00 <br /> Planner III $105.00 <br /> Surveyor 1 $ 85.00 <br /> Surveyor II $ 95.00 <br /> Surveying Associate 1 $ 70.00 <br /> Surveying Associate 11 $ 75.00 <br /> Survey Technician 1 $ 55.00 <br /> Survey Technician II $ 60.00 <br /> Survey Technician III $ 65.00 <br /> Administrative Assistant(1-III) $ 60.00 <br /> Accounting Assistant(1-II) $ 75.00 <br /> 1. EXPENSES <br /> a. Mileage-$0.65/mile <br /> b. Robotics/GPS Equipment-$25/hr. <br /> c. Telephone, reproduction, postage, lodging, and other incidentals shall be a direct charge per <br /> receipt. <br /> 2. ASSOCIATED SERVICES - <br /> a. Associated services required by the project such as soil analysis, materials testing, etc., shall be at <br /> cost plus ten(10)percent. <br /> I <br />