Orange County NC Website
Mr. Jeff Thompson <br /> November 11,2013 <br /> Page 2 <br /> NWP is required. It is also anticipated that there will be no stream or wetland <br /> disturbance on the project site beyond that of road and utility construction. <br /> • It is anticipated that any stream crossings will be constructed utilizing standard size <br /> concrete pipe or box culverts and therefore, bridge and/or structural design has not been <br /> included in this scope of work. <br /> • Prepare construction drawings per NCDOT standards for approximately 2,500 feet of 2 <br /> lane asphalt roadway designed to rural roadway standards, assumed 35 mph design speed. <br /> The design will include realignment of Ben Wilson Road at the intersection of the new <br /> roadway,into a"T"intersection for site visibility. <br /> • Construction plans will include demolition, layout, grading, drainage, sediment and <br /> erosion control and construction details. <br /> • Review construction plans with NCDOT and make revisions as necessary. <br /> • Prepare sediment and soil erosion permit applications for submittal to N.C. Department <br /> of Environment and Natural Resources (NCDENR)for approval. <br /> BASIS OF COMPENSATION <br /> We anticipate performing the scope of services outlined above for a lump sum fee of <br /> $75,000. Payment shall be made monthly as work progresses. <br /> The above fee does not include the following additional services. Should these services be <br /> needed, we will furnish or obtain from others additional services of the following types, which are <br /> not considered Basic Services under this proposal, and will be completed in accordance with our <br /> regular fee schedule,upon your authorization. <br /> • Additional services resulting from significant changes in general scope of the Project or its <br /> design including, but not limited to, changes in size, complexity, OWNER's schedule, or <br /> character of construction. <br /> • This scope of service assumes that the project will not be competitively bid, but will be <br /> constructed by NCDOT forces. <br /> • This scope of service does not include construction administration or observation services. <br /> • The scope of services does not include a Traffic Impact Analysis. Should one be required <br /> we can coordinate with a traffic consultant to provide one as additional services. <br />