Browse
Search
2013-485 AMS - ECS Carolinas LLP County Jail Site EAS Phase 1 Geotech Study Utility Capacity Study $7,600
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-485 AMS - ECS Carolinas LLP County Jail Site EAS Phase 1 Geotech Study Utility Capacity Study $7,600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 2:50:59 PM
Creation date
12/2/2013 2:50:55 PM
Metadata
Fields
Template:
BOCC
Date
12/2/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2013-485 AMS - ECS Carolinas LLP County Jail Site EAS Phase 1 Geotech Study Utility Capacity Study $7,600
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Geotechnical Services and Phase I ESA <br /> Orange County Jail Site <br /> Hillsborough,Orange County,North Carolina <br /> ECS Proposal Number 06:17061 <br /> utilities located in the vicinity of the project site. Normally, this includes water, gas, sewer, <br /> electrical power, telephone, and cable. The individual companies mark their utilities using <br /> spray paint, but only extend to the meter. It is the client's responsibility to identify other <br /> utilities. <br /> • ECS herein asks that the client notify us of all utilities located on-site, particularly those <br /> utilities beyond the meter or private utilities that are not identified by the North Carolina One- <br /> Call Center. While ECS will take precautions to avoid utilities that the owner notifies ECS of, <br /> ECS is not responsible for utilities that the North Carolina One-Call Center does not mark. <br /> • Hiring Private Locator services is beyond the scope of this proposal and not included. <br /> However, for an additional fee, ECS can retain a private locator to locate utilities beyond the <br /> meters and private utilities. If this is needed on this project, please identify this on the <br /> attached "Proposal Acceptance Form." <br /> SCHEDULE OF WORK <br /> We will begin the above scope of work immediately after receiving your written authorization to <br /> proceed. Our work starts with our contacting the public utility locator service, but we cannot <br /> begin work on-site until they have completed their location work, usually within 48 hours, <br /> excluding weekends and holidays. <br /> Based on current availability and weather permitting, we anticipate that the field work will begin <br /> within 3 to 5 business days of written authorization to proceed. We anticipate that the field work <br /> will take about 2 business days to complete, and the reports will be provided within 15 business <br /> days after receiving written authorization to proceed. In order to maintain this schedule, it is <br /> critical that we receive your written authorization, special instructions and distribution list in a <br /> timely manner. <br /> AUTHORIZATION <br /> If the above scope of work is acceptable to you, please sign the Proposal Acceptance Form and <br /> return one copy of the proposal acceptance form to us. Please note that the attached Terms <br /> and Conditions of Service are incorporated herein by reference and are an integral part of this <br /> agreement between us. By signing the Proposal Acceptance Form or referencing this proposal, <br /> you are also accepting the Terms and Conditions of Service and this proposal in its entirety. <br /> Alternatively, you could issue a letter of acceptance or purchase order; but we would ask that <br /> you reference and include our proposal by reference showing proposal number and date. This <br /> proposal is valid for a period of sixty days beyond that date it may be necessary to revise our <br /> schedule or fee. <br /> Using the Proposal Acceptance Form will provide formal authorization for us to perform the <br /> above work, enter the site, and provide proper invoicing instructions and distribution lists for <br /> reports and correspondence. Please provide any specific instructions or details not covered in <br /> this proposal on the attached Proposal Acceptance Form. Please note that we have provided a <br /> place to provide invoicing instructions and report distribution. We will provide the reports by e- <br /> mail; and up to 3 hard copies if this is requested. Please list those to whom the reports should <br /> be sent and provide their e-mail addresses, if appropriate, on the Proposal Acceptance Form. <br /> Again, thank you for the opportunity to submit this proposal to provide services and serve as <br /> your consultant. We look forward to the opportunity to work with you on this project and to <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.