Browse
Search
2013-485 AMS - ECS Carolinas LLP County Jail Site EAS Phase 1 Geotech Study Utility Capacity Study $7,600
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-485 AMS - ECS Carolinas LLP County Jail Site EAS Phase 1 Geotech Study Utility Capacity Study $7,600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 2:50:59 PM
Creation date
12/2/2013 2:50:55 PM
Metadata
Fields
Template:
BOCC
Date
12/2/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2013-485 AMS - ECS Carolinas LLP County Jail Site EAS Phase 1 Geotech Study Utility Capacity Study $7,600
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Geotechnical Services and Phase I ESA <br /> Orange County Jail Site <br /> Hillsborough,Orange County,North Carolina <br /> ECS Proposal Number 06:17061 <br /> prior to completion of the Phase I ESA, please notify us immediately so that ECS may <br /> determine if there are additional lender requirements over and above those specified in the <br /> ASTM Standard. ECS reserves the right to adjust its quoted price for this Phase I ESA if <br /> supplemental investigation or testing is necessary to satisfy requirements which may be more <br /> stringent than those described in this proposal. <br /> The proper performance of "due diligence" in respect to environmental site assessments <br /> requires both an on-site inspection and a careful review of available applicable local, state and <br /> federal public records. It would expedite matters if your office could provide ECS with a site <br /> plan and a point of contact for site access. In addition, we would appreciate receiving a current <br /> chain-of-ownership for the subject site back to at least 1940 if one is available. <br /> FEE ESTIMATE <br /> Geotechnical Services <br /> Based on the scope of services and drilling quantities outlined in this proposal, the lump sum <br /> fee for our services will be $4,000.00. <br /> Phase I ESA <br /> Based on the above outlined scope of services, ECS can perform the Phase I ESA for a lump sum <br /> fee of$2,000.00. <br /> The above fees and our schedule assume that the site is accessible to our ATV-mounted drilling <br /> equipment with dozer clearing. It also assumes that we have full access to the site and are not <br /> required to encounter standby time or wait on others to gain access to our drilling locations. if <br /> these problems are encountered, you will be charged the additional time plus the additional <br /> charges in accordance to our attached Fee Schedule. <br /> Provided conditions are as understood, and as assumed, we would expect the final costs to be <br /> as outlined above. Should conditions, sampling results or observations indicate that additional <br /> work is necessary or warranted, we would notify you of the additional costs before modifying or <br /> expanding the extent of our scope of services. If other items are required based on field <br /> conditions encountered in our field exploration program, they would be invoiced in accordance <br /> with the attached Fee Schedule. Before modifying or expanding the extent of our exploration <br /> program, you would be informed of our intentions for both your review and authorization. <br /> Optional Evaluation of Utility Capacity (water, sewer, gas, electricity, telecom, CATV) <br /> We will notify "One-Call' immediately. We will start our own independent research and field <br /> observation to locate the utility appurtenances. We will contact the various utility <br /> representatives for Duke Energy Progress, PSNC, AT&T, OWASA, Time Warner and others as <br /> needed to determined size, age, materials, locations, capacities, pressures and flow, if <br /> applicable, from record data. Estimated costs for performing these services is $1,600. <br /> Preliminary Items <br /> Existing utilities must be addressed before beginning on-site exploratory work, as follows: <br /> • ECS will contact the public utility locator service, North Carolina One-Call Center, to request <br /> that utilities be marked prior to performing exploratory work (digging, drilling, etc.). The <br /> North Carolina One-Call Center then contacts the utility companies typically known to have <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.