Browse
Search
Minutes - 19860403
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1986
>
Minutes - 19860403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 12:26:10 PM
Creation date
12/2/2013 12:26:08 PM
Metadata
Fields
Template:
BOCC
Date
4/3/1986
Meeting Type
Public Hearing
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
need to be reconsid ered. She questioned whether enough thought had <br /> been given to the collector road system proposed inquiring how the <br /> overall road system would be established. Waldon responded that the <br /> roads would be built as part of the next development. He noted that <br /> improvements to NC 86 need to be a high priority for NCDOT. Willhoit <br /> noted that they are not on the improvements program. Collins stated <br /> that the industrial zoning of the adjoining tract was carried over from <br /> the previous zoning ordinance. <br /> Commissioner Willhoit clarified that residential developments are <br /> not required to provide buffers to industrial sites, but that the <br /> ordinance requires the light industrial uses to provide the buffer to <br /> residential uses at the time of development of the industrial site. <br /> Collins clarified that the ordinance includes requirements for screening <br /> industrial sites upon development. <br /> Pat Evans, Chapel Hill Planning Board Chair, informed the Boards <br /> and Council that the Planning Board had recommended approval of the <br /> development on a 5-2 vote. The negative votes reflected a concern <br /> regarding the premature development of the area and a concern that the <br /> provision of sidewalks is "silly" . <br /> John Loving, applicant, reviewed the partnership involved in the <br /> request for planned development rezoning. He clarified that the <br /> proposal provided for 137 versus 152 units based on response to staff <br /> recommendations that the number of units in each building be limited to <br /> eight and that buildings be separated by a minimum of 25 feet. Loving <br /> commented that based on market research there is a need for housing in <br /> the area and that the applicants were taking the opportunity to provide <br /> for that need. He continued that the project conforms with both the <br /> existing and the draft land use plans. He noted that the location of the <br /> development is ideal for this type of residential unit as it is close to <br /> convenient shopping and the area is residential in nature. He continued <br /> that it is natural for development to move to the north side of the road <br /> for low density multi family units of seven units to the acre. He added <br /> that the units will be for sale, not rental, and are therefore <br /> compatible with the neighborhood. <br /> Dana Staats, CHR Associates, presented his firm's statement on the <br /> project. He explained the design aspects of the project and the <br /> procedures for doing the site analysis. He noted that the objectives <br /> established for the design of the project included compliance with the <br /> requirements of the ordinance, design related standards, OWASA <br /> standards, S&E standards, maintenance of as much natural vegetation on <br /> the site as possible and maintenance of the character and quality of the <br /> area. He indicated that the site was well designed and sensitive to <br /> both the land and the development ordinances as evidenced in the site <br /> plan and in the staffs' recommendation. <br /> Staats reviewed the retention of vegetation on the site. He noted <br /> that existing vegetation would be retained in the buffer, internally in <br /> the sections noted and in addition other internal vegetation as could be <br /> saved during the construction process. He added that the development of <br /> a detailed landscaping plan is both required and a standard for the <br /> firm. He emphasized that the building units are laid out with the <br /> topography and that all units will be developed with slab on grade <br />
The URL can be used to link to this page
Your browser does not support the video tag.