Browse
Search
Minutes - 19850219
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1985
>
Minutes - 19850219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 10:53:37 AM
Creation date
12/2/2013 10:53:35 AM
Metadata
Fields
Template:
BOCC
Date
2/19/1985
Meeting Type
Regular Meeting
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gas <br /> 5 <br /> underground and in locations requiring no clearing or grading in addition to <br /> that required for streets and sewer lines. (See Chapel Hill recommendation <br /> #12). <br /> 15. That the number, location and installation of fire hydrants be <br /> approved in consultation with the Town Manager prior to initiation of <br /> construction activity. (See Chapel Hill Recommendation #1). <br /> 16. That a fire flow report demonstrating compliance with the Town of <br /> Chapel Hill's Design Manual requirements be approved in consultation with the <br /> Town Manager prior to issuance of any development permit and that an on-site <br /> test documenting an actual flow which meets Town standards be completed prior <br /> to issuance of a Certificate of Occupancy. (See Chapel Hill recommendation <br /> #14) <br /> 17. That clearing limits shown on the plan be maintained during <br /> construction by the erection of appropriate fencing or barriers delineating <br /> these clearing limits and protecting the existing planting. (See Chapel Hill <br /> recommendation #15). <br /> 18. That individual building details be submitted to determine compliance <br /> with applicable building codes prior to issuance of any building permits. <br /> 19. That signage details be submitted to determine compliance with <br /> Article 9 Signs prior to the issuance of any sign permits. <br /> 20. That a phasing plan be approved prior to the initiation of <br /> construction activity and that all site improvements required for each phase be <br /> completed before a Certificate of Occupancy is issued for any unit within a <br /> given phase. (See Chapel Hill Recommendation #16). <br /> 21. That a revised site plan, which meets all the conditions specified <br /> above, be submitted and approved prior to the issuance of the Special Use <br /> Permit. (See Chapel Hill recommendation #17) . <br /> 22. That the 100' setback requirement be waived along the southern <br /> property line as shown on the site plan because Weatherstone is actually <br /> developed at R-8 densities and the other affected adjacent parcel is a power <br /> sub-station. <br /> 23. That the applicant provide parking details which satisfy Article 10 <br /> Parking. <br /> NOTE: THE PLANNING BOARD ADDED CONDITIONS #22 AND 23 TO THOSE PRESENTED AT <br /> PUBLIC HEARING AS PART OF THEIR RECOMMENDATION FOR APPROVAL. <br /> Chair Willhoit requested Collins to list the Planning Board's <br /> negative finding of fact and to relate the finding with the Planning Board's <br /> recommendation which would provide the corrective action. <br /> Section 8.6.10 - Elevations of structures - condition #18 <br /> Collins noted that the plan was revised three times and detailed <br /> building plans were not submitted as part of the final plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.