Browse
Search
Minutes - 19850516
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1985
>
Minutes - 19850516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 10:38:17 AM
Creation date
12/2/2013 10:38:16 AM
Metadata
Fields
Template:
BOCC
Date
5/16/1985
Meeting Type
Municipalities
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
000074 <br /> Horace Johnson, in referring to the line and the possibility that Hills- <br /> borough would want to tap onto the line, stated he felt there would be no <br /> immediate need for the development to extend out that far, and if the <br /> development did extend out that far, the Town would need to justify the <br /> associated cost for such an extention. A compromise would be for the County to <br /> construct the line and in the future give the Town an opportunity to buy that <br /> portion of the line. He felt the Town would like to control the line. <br /> Commissioner Marshall stated that if the other Commissioners felt it was a <br /> good idea, an agreement would need to be worded very specifically to preserve <br /> the interest of the County. <br /> Lynwood Brown indicated the $15,000 could be paid up front. <br /> Kenneth Thompson indicated that according to FmHA, the County would have <br /> to fund the cost of construction for the part of the line that the County <br /> intends to sell in the future. The loan/grant monies could not be used to <br /> finance that portion of the line. <br /> Commissioner Marshall indicated the prime responsibility is to serve the <br /> 191 customers before any other County money would be put forth or any <br /> construction done on a part of the line that would not be covered by loan or <br /> grant money. <br /> Remus Smith noted that the force line could be put in the same ditch as <br /> the water line that comes down for OWASA. He feels it a mistake for people in <br /> Orange Heights to pay a county tap fee when in the next year or so they may be <br /> annexed into the Town. <br /> Lynwood Brown asked if the County would allow the town to tie on if the <br /> land is ever developed on the west side of the river since the agreement states <br /> no parallel lines. <br /> Shirley Marshall asked about the water pressure if a large development is <br /> allowed. She sees no problem in permitting the town to run a parallel line. <br /> Ken Thompson indicated the Town could tie on off of US 70. The intent in <br /> number nine (9) of the Wastewater Collection and Purchase Contract was not that <br /> there would be a restriction to expand into Hillsborough's extraterritorial <br /> area of the system but rather to restrict lines from going into the Efland <br /> area. <br /> Horace Johnson proposed that the County use the FmHA money to build the <br /> line west of the river and use the County money to build the line to the river <br /> east of Hillsborough and then give the Town an opportunity, at some time in the <br /> future, to purchase the line east to Hillsborough. The Town could use the <br /> money from the tap fees to pay for the line. In this way the Town would buy <br /> that portion of the line that the County owns and not the portion that FmHA <br /> owns. <br /> Ken Thompson indicated that in order for that to happen there would need <br /> to be a separation of the two projects and both grant applications would need <br /> to be amended. Commissioner Marshall indicated that FmHA would not permit the <br /> County to separate the project. <br /> Remus Smith noted that this project, as proposed, is for usage of up to <br /> 325,000 gallons a day. The expected usage is 42,000 gallons per day. Any new <br /> development would not be ten times that amount. <br /> Geoffrey Gledhill noted that if the Town were allowed to purchase any <br /> portion of the line, the application would need to be amended. <br /> Geoffrey Gledhill suggested Hillsborough run a parallel line west of US 70 <br /> that would connect east of the meter point. <br /> Horace Johnson noted that the Town could run a parallel line up US 70 to <br /> Lake Shore Drive but it would put extra stress further down the line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.