Browse
Search
Minutes - 19850528
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1985
>
Minutes - 19850528
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 10:30:10 AM
Creation date
12/2/2013 10:30:08 AM
Metadata
Fields
Template:
BOCC
Date
5/28/1985
Meeting Type
Public Hearing
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
000098 <br /> account of the environment. Again, we need a choice because Orange County is <br /> on the fringe of the Research Triangle Park. Research Triangle Park is basic- <br /> ally for research and research applications. Things associated with it tend to <br /> locate around the edges of the park, particularly in industrial parks located <br /> on the fringe. If a company is looking for a park location, they do not look <br /> at Orange County because we have no industrial park. <br /> Therefore, we need both individual sites and industrial park sites and we <br /> need them properly zoned. Competition requires this. The kind of companies we <br /> want are choosy. We need to be able to offer them the choice to get them to <br /> look at Orange County so we can look them over too. We are choosy too. We <br /> want non-polluting, high quality, good paying jobs and a range of skills. We <br /> can be choosy on who we accept. But, we need to attract them so we can be as <br /> selective as possible. <br /> She indicated that the Horton project met all the criteria of the Land Use <br /> Plan and the needs of the area, including quality development. <br /> She urged the Boards to support this rezoning so that the County can go <br /> after the type of industry she described for northern Orange County. <br /> Cormann Drumm, NC Dept. of Commerce, stated that industrial parks, with <br /> restrictive covenants, are becoming popular within the state. Industrial <br /> parks, when properly graded, preserve the aesthetic value of the property. He <br /> cited some parks around the state that are good examples of quality developme <br /> nt. He stated that he feels rezoning is mandatory. If the zoning is not <br /> available, prospective clients do not even consider an area. Businesses <br /> looking for industrial parks go to the State for guidance. This, too, would <br /> help assure Orange County that unsuitable industry would not be directed this <br /> way. <br /> Valerie Greenberg inquired if Mr. Drumm felt that would hinder the goals <br /> that EDC had mentioned. <br /> Drumm responded that he felt that a planned development of this type is <br /> very difficult when you don't know all the types of industry that may be <br /> interested in development in the area. <br /> Sylvia Price also was asked this question of planned development versus <br /> straight rezoning. She responded that this was not like a subdivision. You do <br /> not know the exact size, shape, and number of buildings. Basically, you need <br /> to be able to tell clients you will build to meet their individual needs. <br /> Walker noted the question of whether planned development would be <br /> detrimental had not been answered. Price responded that in a project such as <br /> this you could not do an accurate or adequate planned development. If the <br /> clients didn't want the kind of building shown on the plan, the whole process, <br /> which kills client relationships, would have to be worked through again. <br /> Willhoit noted that the EDC had been concerned for a long time with having <br /> land that was prezoned. He understood the Planning Board's desire to have <br /> planned development applications so that many of the features of development <br /> can be reviewed and so that it can be determined if it is the type of devel- <br /> opment the County wants. <br /> Given that the request was presented as a straight rezoning and granted <br /> that approval cannot be given conditionally the County has, however, been <br /> presented witha lot of information that goes beyond what we might ordinarily <br /> get in a rezoning request. He assumed that the EDC has worked closely with Mr. <br /> Horton in terms of the concept and, recognizing the importance of the parcel at <br /> the entry to Hillsborough, that there is a desire to make it a model type <br /> development which will really set the pattern for future economic development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.