Orange County NC Website
000099 <br /> He continued that the Planning Board needs to take a look at planned devel- <br /> opments, noting the four major parts of a planned development include: access <br /> (roads); screening; building and parking; and landscaping, though there may be <br /> other things considered also. <br /> Wilhoit continued that there may be an intermediate step in prezoning <br /> where it may be a rezoning, but also a planned development that would at least <br /> address access and screening. He understood that that may not be practical in <br /> this case. Price responded that the criteria mentioned would have to be met <br /> prior to actual development of the site. She noted that potential clients <br /> would not look at sites that were not zoned. Wilhoit continued that <br /> landscaping depends on the type of buildings proposed. But it was clear that <br /> this project was not at the stage of recommending buildings and that appears to <br /> be the reason why a planned development is not proposed. <br /> Sylvia Price again stated that clients will not look at Orange County <br /> unless the sites are zoned. They then want to know the requirements for <br /> development of the site. She continued that they want to know if they can <br /> actually do the deal and are looking for a reason to scratch Orange County off <br /> their list of potential sites. <br /> Willhoit clarified that he was trying to suggest that a way to look at <br /> planned developments in the future for industrial parks would be for the <br /> planned development to deal with access and screening questions which are <br /> independent of the type of development that goes on within the tract of land. <br /> Perhaps for industrial parks that would be sufficient if we address those and <br /> perhaps some limit on the number of vehicles or square footage without <br /> specifying design of individual buildings. <br /> Price noted that at the moment she was operating in a vacuum. <br /> Wilhoit noted that perhaps planned development standards do not fit well <br /> with industrial park type development, but were oriented more for other types <br /> of development. <br /> Marshall noted that it may be worthwhile for the Board to look at what it <br /> could do to facilitate this development. particularly when it's in a major <br /> transportation corridor. The group of regulations may not be complete, but <br /> there will still be some control over the rezoning, rather than just looking at <br /> industrial parks alone. <br /> Price urged the rezoning and monitoring the development closely. <br /> John Gastineau, chairman of EDC, spoke of the need for industrial parks. <br /> This site has been identified as the best choice for the first park in the <br /> County. He feels the Horton project meets all the important criteria for <br /> quality development of the kind Orange County is seeking. <br /> Henrietta Auman, an adjoining property owners stated she had lived in <br /> this area for forty years. She expressed concern with the buffer zone and she <br /> asked for assurance of supervision once the work begins. <br /> 3. Z-8-85 SCOTSWOOD (Rezoning from Residential-1 to Residential-2, <br /> Residential-4 and General Commercial-IV.) <br /> The presentation was made by Marvin Collins. <br /> Collins expressed a staff preference that development of this property be <br /> pursued as a planned development. <br /> Collins cited the comments of George Vaughn received by phone in <br /> opposition to the project. <br /> Sharlene Pilkey inquired about the traffic counters near the site. Susan <br /> Smith responded that the counters were being used to provide data for the <br /> Secondary Roads Improvements Program. <br />