Browse
Search
Minutes - 19851119
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1985
>
Minutes - 19851119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 9:31:43 AM
Creation date
12/2/2013 9:31:41 AM
Metadata
Fields
Template:
BOCC
Date
11/19/1985
Meeting Type
Regular Meeting
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
000�8� <br /> impervious surface ratios shall be required as provided <br /> in the Table of Impervious Surface Ratios Section <br /> 6.23.4. Impervious surface calculations for an <br /> individual development shall be cumulative for original <br /> construction and any subsequent additions and <br /> calculations of impervious surface coverage for <br /> individual lots shall include that portion of a right- <br /> of-way between the centerline of the street and the edge <br /> the abutting property line of the lot. <br /> ORDINANCE AMENDMENT(S): <br /> 6.24.8 Control of the First 1/2" of Runoff from Lhmrvious Surfaces <br /> Stormwater runoff from impervious surfaces generally carry <br /> large amounts of oil, nutrients, metals, bacteria and other <br /> pollutants. The amount of such pollutants in stormwater runoff <br /> is closely associated with the land use from which it <br /> originates. An important determinant of water quality is the <br /> increase in impervious surfaces which prevent the natural <br /> infiltration of water into the soil. Most of the pollutant <br /> concentration is carried in the "first flush" of runoff. To <br /> control this pollutant load within the Water Quality Critical <br /> Area the first one half-inch (1/2") of runoff from all <br /> impervious surfaces in new developments shall be controlled. <br /> The purpose of the stormwater control measure is to reduce off <br /> site effects by minimizing clearing, compaction and overall site <br /> disturbance, while maximizing vegetated areas for stormwater <br /> infiltration. Methods to accomplish this standards shall <br /> include, in order of preference: <br /> a. on-site infiltration through the retention of <br /> undisturbed, vegetated areas <br /> b. structural or engineered infiltration measures, such as <br /> trenches or retention ponds, which reduce the amount of <br /> runoff <br /> c. detention structures that reduce the rate of runoff. <br /> Areas to which the standard applies shall include individual <br /> lots or a new development as a whole. If applied to a <br /> development as a whole, the applicant must provide for <br /> installation and maintenance of proposed stormwater management <br /> facilities. Applicants shall be required to submit <br /> documentation which indicates compliance with the specified <br /> standard. <br /> An individual lot of 80,000 square feet or more in size created by <br /> deed or plat in accordance with Orange County Subdivision <br /> Regulations prior to the adoption of this provision shall be exempt <br /> from this requirement upon submittal of a <br />
The URL can be used to link to this page
Your browser does not support the video tag.