Browse
Search
Agenda - 06-03-1996 - IX-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 06-03-1996
>
Agenda - 06-03-1996 - IX-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2013 9:58:08 AM
Creation date
11/26/2013 9:58:06 AM
Metadata
Fields
Template:
BOCC
Date
6/3/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-d
Document Relationships
1996 S Purchasing - Comfort Engineers for SHSC Construction
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1996
1996 S Purchasing - D H Griffin -General Contractor SHSC Construction
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1996
1996 S Purchasing - Eakins Plumbing for SHSC Construction
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1996
1996 S Purchasing Watson Electrical Construction for SHSC Electrical Contractor
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 4 <br /> Mechanical and Plumbing Systems: <br /> Modifications to HVAC system; includes such items as $62,000.00 <br /> elimination of chiller and installing direct expansion rooftop units; <br /> install a single cast iron boiler in lieu of multiple packages; change <br /> controls. (Note: The estimated increase in annual energy costs <br /> associated with this change is $3,685, which represents a 20-year <br /> payback. This is four times as long as the Department of Energy <br /> standard.) <br /> Reduction as a result of floor plan revision $3,680.00 <br /> Change brand of plumbing fixtures $2,300.00 <br /> Change to PVC plumbing waste and vent, from cast iron $6,400.00 <br /> Sub total HVAC/Plumbing contract revisions: $74,380.00 <br /> Electrical contract: <br /> Reduction as a result of floor plan revision $2,490.00 <br /> Sub total Electrical contract revisions: $2,490.00 <br /> Total contract revisions: $637,200.00 <br /> Estimated sales tax amount which is reimbursed to the County by $71,500.00 <br /> the State (This amount is included in the bid amounts and will be <br /> included in the contract amounts, but will be shown as an offset <br /> expense item in the project account. The net effect of taxes paid is <br /> $0 since they are completely reimbursable by the State.) <br /> Total amount of credits against original bid amounts $608,700.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.