Browse
Search
Agenda - 06-03-1996 - IX-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 06-03-1996
>
Agenda - 06-03-1996 - IX-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2013 9:58:08 AM
Creation date
11/26/2013 9:58:06 AM
Metadata
Fields
Template:
BOCC
Date
6/3/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-d
Document Relationships
1996 S Purchasing - Comfort Engineers for SHSC Construction
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1996
1996 S Purchasing - D H Griffin -General Contractor SHSC Construction
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1996
1996 S Purchasing - Eakins Plumbing for SHSC Construction
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1996
1996 S Purchasing Watson Electrical Construction for SHSC Electrical Contractor
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> ORANGE COUNTY SOUTHERN HUMAN SERVICES CENTER <br /> VALUE ENGINEERING OPTIONS <br /> DESCRIPTION AMOUNT OF CREDIT <br /> General Construction: <br /> Eliminate screen walls and fencing at service court $72,800.00 <br /> Lower building and parking lot to reduce fill and use existing small $43,000.00 <br /> clearing as onsite borrow area <br /> Change roof system to ballasted single ply $14,490.00 <br /> Modify entrance way $11,900.00 <br /> Delete curb and gutter at parking area $16,700.00 <br /> Reduce landscape by 20% $13,440.Q0 <br /> Hardware allowance duplicated in bid $15,000.00 <br /> Revise foundation drainage system $9,000.00 <br /> Delete onsite trailer for architect $3,350.00 <br /> Change to less expensive carpet backing (durability factor and $6,200.00 <br /> weight of carpet remain the same) <br /> Revise canopy at south face of building $4,800.00 <br /> Revise reception desk in lobby $2,500.00 <br /> Delete moveable screenwalls in waiting area $2,100.00 <br /> Revise operable partition finishes $1,850.00 <br /> Floor plan revisions. Deletes one small meeting room and $43,200.00 <br /> modifies the configuration of the others, thereby allowing two long <br /> corridors to be deleted. Net square footage reduction <br /> approximately 1,600 s.f. <br /> Defer purchase of furniture and signage $74,500.00 <br /> Defer construction of Homestead Road improvements $120,000.00 <br /> Delete screen walls and pads at chiller $5,500.00 <br /> Sub total general contract revisions: $460,330.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.